No. Name of Scientist Designation Contract Title Lab Date of Commencement Duration Cost
1 GK Sarkar Sc. 'F' Professional Services for Assistance in the Development of new/existing projects R&DE-41 19/9/2018 12 months 8.93
2 Tara Singh Terchnical Services for Testing of Electronic fuze modules of munitions/mines and Field trial activities of PRACHAND Device under NFM ARDE-62 22/11/2018 10 months 9.35
3 AA Ghosh Services to Support Setting UP and Configuration of Hardware and Software for Enterprise Level Project Management for the Projects in the Laboratory HEMRL-36 21/1/2019 12 months 6.56
4 SB Lokhande Professional Service Quality Requirement for Projects Mine Field Marking Equipment MK-II (MFMEMK-II( & self Propelled Mine Burier RDE-43 03/11/2019 12 months 9.71
5 CM Kulkarni Support services and consultancy for processing of inert and high explosive compositions HEMRL-37 15/4/2019 12 months 9.63
6 Dr. CP Achuthan Technical services for preparation and supply of 11 no. of GES set for LCA fighter and trainer aircraft HEMRL-38 30/11/2018 10 months 8.72
7 TK Ghosh Consultancy Services for Vaibhav, Vishal, Nipun & Ulka of NFM Projects ARDE-63 09/09/2018 11 months 2.68
8 CM Kulkarni Support services and consultancy in processing of inert and high explosive pressed charges HEMRL-39 31-03-19 14 months 9.18
9 Dr. DB Sarwade Support Services and Consultancy for process control document of different products HEMRL-40 06/04/2019 11 months 9.86
10 SS Kulkarni Consultancy Services for Productionisation of Adrukshy Mk-II ARDE-64 05/03/2019 11 months 9.91
11 Dr. CP Achuthan Support Services for Consultancy for development of Next Generation Explosive Reactive Armour(NGERA) HEMRL-41 31/5/2019 16 months 9.65
12 SS Pundale Services for Radiographic Inspection and Evaluation of System of High Energy Materials HENRL-42 19/2/2019 7 months 9.67


CLOSED CONTRACTS:

No. Name of Scientist Designation Contract Title Lab Date of Commencement Duration Cost
1 Shri S S Pol Sc. 'E' (Retd) To work out initial conceptual design and preparation of provisional drawings and schedule of tests and trial required to evaluate the design of Fuze DASD for Non- Spinning Submunition." (Contract ARDE- 1)
Remarks:
• Review of the existing design of nonspinnable fuzes and suggest the optimized design • Assessment of aerodynamic forces during the descent of fuzed warheads and to assess the arming parameters and their safeties. • Manufacture, assembly, fitting, tests and trials.
ARDE Jul-04 7 Months 1.92
2 Shri C R Mani Sc. 'D' (Retd) Consultancy Services and Association for Preparation of Influence Mine Mark –II stores for user evaluation, methods for user trials and preparation of TOT documents for Influence Mine except influence fuze". (Contract ARDE- 2)
Remarks:
• Scrutiny and updating the design documents including tolerances, safety aspects and functional requirements • Establishment of Manufacturing methods, assembly procedures and QA/QC aspects • Prototype assembly, filling etc • Fabrication of accessories for conduct of tests and trials
ARDE Apr-04 6 Months 2.83
3 Shri R Bhattacharya Sc. 'G' (Retd) "Scrutiny and updating of Production documents of Pinaka System" (Contract ARDE- 3)
Remarks:
Compilatiom of documents for Pinaka Launcher Tube by IDST. 1) QA and QC (2) Proof Schedule & Sentencing Criteria for Pinaka Rocket System. (3) Assembly for Integration of Aluminium POD, FRP Launcher Tube Cap & Lock Assembly.
ARDE Feb-04 6 Months 4.50
4 Shri Abraham Verghese Sc. 'D' (Retd) "Revision of existing Range Manual and publishing of new one incorporating all old and new facilities in ARDE and duties of all employees working in range." (Contract ARDE- 4)
Remarks:
Revision of existing Range Safety Manual & Publishing of new on incorporating all old & new facillities in ARDE Range, Duties of all employees working in these facilities and safeties to be followed during explosive related activities in these buildings.
ARDE Dec-04 12 Months 2.17
5 Dr K V Prabhakaran Sc 'E' (Retd) "Study & Design optimization of 76.2 mm Caliber Submunition P- Charge". (Contract ARDE - 5, P-Charge)
Remarks:
• Development of coherent aerodynamically stable projectile capable of defeating > 0.4 D in RHA at a long off distance of 666 cal. • Optimisation of submunition P – charge by studying VODon projectile, formation effect of casing thickness etc. • Optimisation of L/D ratio and subcalibre ratio • Enhancement of lethality
ARDE Jan-06 18 Months 3.37
6 Shri R Bhattacharya Sc. 'G' (Retd) "Preparation of Technical Documents for the armament system of ICV-ABHAY." (Contract ARDE- 6)
Remarks:
(a) Design Configuration document for complete armament system including main & secondary armaments of ICV ABHAY(b) Technical Manual for main and secondary armaments. (c ) Operating Manual for main and secondary armaments
ARDE Mar-07 10 Months 4.79
7 Shri V V Makhija Sc. 'D' (Retd) "Consultancy for Vetting of QA/QC documents of project equipments & Components at planning and procurement stage." (Contract ARDE- 7 )
Remarks:
Technical vetting of various drawings, specification of the components, equipment, instruments etc required for the development of the projects and other technical activities. The vetting of QA/QC dourments carried out every stage of procurement i.e. from planning to the final inspection of the items.
ARDE Mar-07 12 Months 2.86
8 Shri S V Bivalkar Sc. 'E' (Retd) "Consultancy for providing professional assistance in preparation of feasibility study report and statement of case for development of new family of seven mines." (Contract ARDE- 8,)
Remarks:
Not Materialised. Project Cancelled
ARDE Jul-08 04 Months 8.36
9 Shri S K Chaturvedi Sc. 'F' (Retd) "Consultancy for remote setting and actuation of ground devices and remote activation - deactivation of underground devices." (Contract ARDE- 9)
Remarks:
• Literature survey • Formulation of subsystem specifications • Preliminary design concepts • Power requirements and dimensional details • Preparation and finalisation of design documents • Identification of industrial partner • Identification of critical areas • Tests and evaluation
ARDE Aug-07 03 Months 9.88
10 Shri J S Gharia Sc. 'G' (Retd) "Consultancy Service for Design of Thermobaric Warhead system of 200 kg class." (Contract ARDE- 10)
Remarks:
This Pilot project on the "Design of a Themobaric warhead of the 200 Kg class, is the precuror of R&D Activity on Thermobaric Weapons as a follow up programme relating to the wide-ranging multi-unit efforts of the DRDO to develop rockets and missiles which can land warheads accurately near/into the entrance protalsof military parking lots of the enemy, housing crucial facillities and equipment in impregnably fortified and labyrinthin sapces especially in deep underground locations- facilities which are in accessible array of conventional weapons including penetration -cum-blast warheads..
ARDE Nov-07 8 Months 5.97
11 Dr K V Prabhakaran Sc. 'E' (Retd) "Consultancy Services for design and optimization of 76.2 mm Caliber P-Charge with Liner made of low carbon steel." (Contract ARDE- 11)
Remarks:
Updated Literature survey. Studied the low carbon steel sheets available in the market. Assessed their sujitability of determining their mechanical properties and p;ercentge composition. Associated wioth modeling done by warhead team. Based on medling data p;romising models were selected. These were refined based on limited information in published literature and past experience in the field. Few tentative designs of EFP warhead wsere prepared by taking into consideration of the factors that influence the formation of an EFP.
ARDE Dec-07 08 Months 1.97
12 Shri D Sarkar Sc. 'E' (Retd) "Consultancy for Vetting of QA/QC documents of project equipments & components at planning, procurement and inspection stage" (Contract ARDE – 12)
Remarks:
Vetting of QA/QC documents was carried out as follows:- (i) Vetting of Drawings, (ii) Qualityh Acceptance Plan (QAP) (iii) Specification(iv) Vetting of Technical Offers (iv) Finalisation of Drgs/Specn before placemednts of supply orders (v) Vedtting of Inspection Reports.
ARDE Apr-08 12 Months 6.65
13 Shri P M Bhat Sc. 'F' (Retd) "Preparation of Documentary film on 'ARDE's CONTRIBUTION IN NATIONAL DEFENCE' " (Contract ARDE- 13)
Remarks:
Prepared Documentary Filims covering ARDE's brief History, objectives, achievements, products developed and contributions with duration of 30 minutes and 15 minujtes both in English and Hindi. Delikvered DVDs for the same
ARDE May-08 08 Months 8.50
14 Shri S S Pol Sc. 'E' (Retd) "Design, Modeling and Simulation and Critical technology areas for NFM." (Contract ARDE- 14)
Remarks:
• Preparation of design guidelines and preliminary drawings for all the seven types of mines under NFM for guidance to the developing agency • Preparation of QR for all the seven stores to facilitate identification of production agencies • Evolution of criteria for short listing of development partners and subsequent selection of one or two agencies • Coordination of preparation of RP/metallic/Wooden models for complicated components, sub systems and mechanisms I order to verify methodology and form, fit and function checks • Evolving sub-system /system level tests and evaluation methods
ARDE May-08 5 Months 9.64
15 Shri G C Adhikari Sc. 'F' (Retd) "Consultancy for Vetting of Drawing and QA/QC documents of mine A/T Hollow change with Influence fuze MKII (AdHRUSHY – II)" (Contract ARDE – 15 )
Remarks:
(a) Terchnical Vetting of Drawings, Qualityh Assurance Procedure(QAP) and specification for the components, sub-system and system for "ADRUKSHY-II ". (b) Attended all the Project Review Meetings(PRC) for approval/amendment of drawings and QAP ©Advised on Sentencing of empty component lot in case of deviations noticed during inspection. (d) Vetting qualitgy Audit of QC docment of various hardware (e) Attended all meetings related to Productionisation of "ADRUKSHY II" system at ARDE and at OFs.(f) Attended the Flight Readiness Review (FRR) committee meeting for the Technical and Proof trials of "ADRUKSHY" system
ARDE Apr-09 12 Months 4.36
16 Shri D Sarkar Sc. 'E' (Retd) "Consultancy for Vetting of QA/QC documents of Project equipments of planning and procurement stage" (Contract ARDE - 16 )
Remarks:
(a) Technical vetting /evaluation of specification and drawings for the compo9net/equipment being procured for vaious projects and other technical activities (b) Technical evaluation of the offers received from the vendor © Finialization of specification/QAP/Drgs before placement of supply orders (d) Qualitative verification of the technical store as per laid down test plan design drawings. (e) Technical support for inspection of Sigma-30 systems being procured for Army till store received and inspection completed. (f) Technical support in connection with to & for conveyance of equipments/stores supplied to ITM Israel for the Trajectory Correction System (TCS) of Pinaca MBRL System under Development
ARDE Apr-09 16 months 9.36
17 Brig. (Retd) V D Prabhu Brig. (Retd) "Consultancy Services for improvement in performance of 120 mm Arjun hesh Ammunition through design optimization" (Contract ARDE - 17)
Remarks:
• Study of Scab formation with reference to the Explosives quantity • Study the percentage combination of RDX:WAX • Study filling methodology, • Evaluate the Fuze design and its relation with delay time, • Study the use of Armour plates Forged Vs Rolled • Study the Proof Specifications vis —a- vis UK 105mm & 120 mm HESH • Work out fool proof method to record fuze delay time. • Work out Instrumentation for record of scab formation & Explosive spread by Flash X-Ray method • Work out revised Proof specification if required
ARDE Jun-09 8 Months 6.55
18 Shri S V Bivalkar Sc. 'E' (Retd) "Study Report on 120 mm FSAPDS MK-II" (Contract ARDE-18)
Remarks:
FSAPDS Mk-Il ammunition for Tank had certain shortcomings in respect of consistency and lethality. IDST undertook the detailed investigation and suggested certain rectifications in the design in order to achieve consistency within 0.35 mils at all temperatures between – 10 deg C to + 55 deg C. The expert also suggested rectification of design in order to achieve lethality on 230 mm RHA plate (depth of penetration mm 500 mm).
ARDE Jun-09 2 Months 0.62
19 Shri S G Tatake Sc. 'F' (Retd) "Consultancy Service for Technology Mapping for Electromagnetic Propulsion." (Contract ARDE-19)
Remarks:
• To study the latest technologies available in world over in the field of electromagnetic propulsion. • Literature survey and Global status of electromagnetic propulsion. • Identification of all the systems and sub-systems required to setup an electromagnetic propulsion facility. • Market survey for availability of sources of supply. • Identification of industries /Academic institutes working for the development of sub-system leading to development of electromagnetic facility. • Cost estimates of all the systems, sub-system and infrastructure required to be setup in ARDE for an EM launch facility • HR requirements in various disciplines in Science and Engineering for working and setting up of an electromagnetic facility.
ARDE Jan-10 04 Months 5.42
20 Shri D Sarkar Sc. 'E' (Retd) "Consultancy for vetting of QA/QC documents of project NFM equipments & components at planning, manufacturing and procurement stage" (Contract ARDE - 20 )
Remarks:
The following were done during the period to the Project NFM system consisting NIPUN, ULKA, VIBHAV, VISHAL, PARTH, PRACHAND. (a) Vetting of technical input documen ts before Tender Enquiry. (b) Vetting of technical offers ( c) Finalisation of technical documents provided along with Development Contracts. (d) Lialised with vendors with respect of techncial documents. (e) Scruitiny of initial technical documents received from vendors.
ARDE Oct-10 12 Months 8.69
21 Shri S S Pol Sc. 'E' (Retd) "Acquisition of Consultancy Services for New Family of Munitions" (Contract ARDE - 21)
Remarks:
• Verification and scrutiny of design documents to be submitted to joint development partners • Preparation of stage inspection and gauge schedules at component and subsystem levels • Development of tools, fixtures and test fixtures • Preparation of test plans and procedures at various component and subsystem level • Test and evaluation plan
ARDE Oct-10 12 Months 9.52
22 Shri R B Marathe Sc. 'E' (Retd) "Consultancy Service for investigation into cause of failures of Nylon DB/CB of Arjun Tank Ammunition" (Contract ARDE - 22 )
Remarks:
• Identification of causes of failures • Survey and study the tests, test methodologies, facilities available vis – a –vis tests required for pinpointing the causes of failure • Conduct of necessary physical, chemical, thermal. environmental tests or combinations of theory required • Analysis of test results • Recommendation of modifications to existing process/handling of store and design of bands • Assignment of Service life to CB and DB based on the tests and theoretical knowledge • Recommendation of suitable material to existing Nylon 6/6 if available in the market and reasons for change in material
ARDE Dec-10 6 Months 8.67
23 Shri C M Kulkarni Sc. 'F' (Retd) "Updation and Digitization of old drawings, specifications, proof schedules and preparation of TOT documents of power cartridges" (Contract ARDE - 23)
Remarks:
• Review of drawings, specifications and proof schedules of various types of power cartridges • Dimensional analysis in respect of dimensions and tolerances and incorporation of corrections in the digitized drawings and documents • Finalisation of specifications as per current practice • Cross linking between drawings, specifications and proof schedules to eliminate ambiguity • Finalisation of TOT documents
ARDE Jan-11 6 Months 7.60
24 Shri S V Bivalkar Sc. 'E' (Retd) "Consultancy for development of short length primer propellant combination for Tank Ammunition". (Contract ARDE - 24 )
Remarks:
• Study of primer/propellant combination in existing tank guns • Survey of various primers for a short length with triple base propellant analysis • Development of test rig to study combustion characteristics • Matching of PT curve for existing propellant and primer
ARDE Jun-11 6 months 8.30
25 Shri S S Kulkarni Sc. 'F' (Retd) "Consultancy Services for Productionsation of Adrushy MkII & 30 mm HE Genade for AGS 17". (Contract ARDE - 25 )
Remarks:
• Preparation of stagewise inspection of various components and subassemblies supplied by trade and/or manufactured by Ordnance Factory • Development of tools, fixtures, test gadgets for productionisation • Preparation of test plan and procedure at various componet/subassembly stage • Support to production centres for proper assembly • Tests and Evaluation trials
ARDE Jun-11 12 months 8.39
26 Air. CMDE Raghubir Singh AIR CMDE “Technical Services for Development of Software Code for Preliminary Design (Sizing & Shaping) of Solid Propellant Rocket” (Contract ARDE - 26 )
Remarks:
IDST provided Technical Services for development of a design code to enable preliminary design(sizing & shaping ) of Solid Propellant Rocket (SPR) given a set of requirements (pay load, range, calibre) and constraints as inputs. It had developed an integrated design tool which will be useful to design a multi-barrel rocket system.
ARDE Aug-11 6 months 9.95
27 Shri C R Mani Sc. 'D' (Retd) "Technical Services for Productionisation of Influence Mine (ADRUSHY) Mk II". (Contract ARDE - 27 )
Remarks:
• The quality check of empty hardware at trade • QA and QC of electronic components like influence fuze and accessories • Inspection of sub assemblies and testing • Package and accessories • Association during life assessment trials • Association during conduct of lot proof
ARDE Aug-11 5 months 6.03
28 i) Shri D Sarkar, Sc. 'E' (Retd) ii) Shri V V Makhija, Sc. 'D' (Retd) Sc. 'E' (Retd) "Consultancy for vetting of QA/QC documents of project NFM equipments & components at development, manufacturing and procurement stage for six types of Munitions" (Contract ARDE – 28 )
Remarks:
• Preparation of stagewise inspection of various components and subassemblies supplied by trade and/or manufactured by Ordnance Factory • Development of tools, fixtures, test gadgets for productionisation • Preparation of test plan and procedure at various componet/subassembly stage • Support to production centres for proper assembly • Tests and Evaluation trials
ARDE Nov-11 12 months 8.89
29 i) Shri S S Pol, Sc. 'E' (Retd) ii) Shri T K Ghosh, Sc. 'E' (Retd) Sc 'E' (Retd) "Acquisition of Consultancy Services for New Family of Munitions". (Contract ARDE - 29 )
Remarks:
IDST is assisting in development of 4 types viz. NIPUN, VAIBHAV,VISHAL & ULOKA of New Damily Munitions. Out of Seven different types of munitions under development at ARDE. IDST contributed as follows:- A) Nipun:- IDST assisted right from initial development phase including initial prototypes . Conduct of various functional trials - Modification , manufacture-QA- of 250 sets - subsequent users assisted functional & evaluation trials at users field as well as participation in interaction meeting with users. (B) VHAIBHAV & VISHAL - Assistance for (a) Design finalisation, preparation of Drawings -QAP for manujfacture of prototyp;es - conduct of static trials - design of jigs fixtures & tools for filling - manufacture of initial prototypes - conduct of trials. (c) ULKA- Finalisation of design - drawings of suitable fixtures/trials -static trials in hand.
ARDE Dec-11 12 months 9.71
30 i) Shri. R. B. Marathe, Sc. 'E' (Retd) Sc. 'E' (Retd) “ Consultancy services for design and documentation of Wind Driven Turbo Generator as a power source for rocket fuzes” (Contract ARDE-30 )
Remarks:
Wind driven turbo generator is a very important elem ent for modern fuzes. This avoids the use of power source, which otherwise results in p;roblems of life and air tight assembly of ammn. The consultancy was successfully completed and five prototypes also were submitted to ARDE.
ARDE Feb-12 06 Months 8.72
31 i) Maj. Gen. (Retd) D. Kapil, AVSM, ii) Brig. (Retd) V D Prabhu, iii) Shri S V Bivalkar, Sc. 'E' (Retd) iv) Shri R B Marathe, Sc 'E' (Retd) v) Shri R R Gosavi, Sc 'D' (Retd) Maj Gen(Retd) “Defect Investigation of 120mm Arjun Barrel chipping & Burst during field firing” (Contract ARDE-31 )
Remarks:
During Field firing of MBT by 75 Armed Regts at PFFR, certain major defects viz. barrel chipping in 4 cases while fring FSAPDS ammn., breakage of combustible cvartg cases, primer resistance with nil continuity & barrel burst while firing HESH Shell were observed. R&D HQ ordered defect investigation and entrusted the job to 'Defect Investigation Committee" having IDST active participation. The committee carried out defect analysis of all the lots the floor of concerned ord-factories, technical aujditing of relevant process schedules for manufacture as well filling of ammn. formulation of test procedures, trials programm, conduct of test firings at PXE Balasore & CPE Itaracy analysis of test rial results & suggesting remedial measures for all probable defects and finally offering solutions of existing defective lots already under strage at various depots.
ARDE Apr-12 06 Months 9.53
32 i) Shri. K. Abraham, Sc 'E' (Retd) ii) Shri V S Dhavalikar, Sc 'C' (Retd) Sc. 'E' (Retd) “Consultancy Services for Development Activities of PARTH, PRACHAND, ULKA, Projects” (Contract ARDE-32 )
Remarks:
A comprehensive trial plan for each the muntion system was prepared. A trial directive to assess the fragment distribution and lethality was prepared. Prepared drawing and QAP of Body and Lid assembly , Electronic housing assembly. A new design for the function of Trip cable housing function and Trip and Snap meachanism were concieved.
ARDE Apr-12 12 months 7.16
33 i) Shri S. S. Kulkarni, Sc 'F' (Retd) ii) Shri V S Dhavalikar, Sc 'C' (Retd) Sc. 'F' (Retd) “Technical Services for Productionisation of Influence Mine (Adrukshy MK-II.)” and 30 mm HE Granade. (Contract ARDE - 33)
Remarks:
• To guide for Assembly and filling procedure with check points and evaluation of process for testing of assembly & HE filling qty of 300 mines. • To guide to follow procedures for test & trials to pilot lot evaluation as per QAP • Association with pilot lot evaluation & suggestions for fabrication of suitable accessories required for conduct of evaluation trials by user. • Scrutiny and updating of production drawings and suggestions for manufacture tolerances and safety role for components. • Updating TOT documents.
ARDE Jun-12 12 months 9.86
34 i) Shri R. Vijayappan, Sc 'D' (Retd) Sc' D' (Retd) “Consultancy services for design and documentation of Wind Driven Turbo Generator as a power source for rocket fuzes” ( Cintract ARDE - 34 )
Remarks:
Prepared new AutoCAD drawing of Wahrhead Assy (Filled & Empty) and relevant components, Packing box Wooden for Aft Motor, Adaptor & Blast tube (Flow Formed) Protective Rings for threads of all relevant componets of Rocket and Motors and Warhead etc..New Auto CAD design drawing were prepared base on CATIA drawings for Adaptor, Adapter Blast Tube Assembly, Motor Assembly etc. Inspected various items .
ARDE Jul-12 7 months 6.75
35 i) Shri S S Pol, Sc. 'E' (Retd) ii) Shri T K Ghosh, Sc. 'E' (Retd) Sc. 'E' (Retd) “Acquisition of Consultancy Services for New Family of Munitions” (Contract ARDE - 35 )
Remarks:
• Preparation of design guidelines and preliminary drawings for all the seven types of mines under NFM for guidance to the developing agency • Preparation of QR for all the seven stores to facilitate identification of production agencies • Evolution of criteria for short listing of development partners and subsequent selection of one or two agencies • Coordination of preparation of RP/metallic/Wooden models for complicated components, sub systems and mechanisms I order to verify methodology and form, fit and function checks • Evolving sub-system /system level tests and evaluation methods
ARDE Feb-13 12 months 9.93
36 i) Shri R R Gosavi, Sc. 'D' (Retd) ii) Shri K K De, Sc. 'D' (Retd) Sc. 'E' (Retd) “Consultancy Services for Development Actvities of PARTH Device under NFM” (Contract ARDE - 36 )
Remarks:
Project : PARTH - Carried out mould design of tools, fixtures and test jigs for carryingf environmental testing. 3D visualisation and testing of moulds. Scruitinised and verifed of component/sub assemblies of prototype. Prepared documents .
ARDE Apr-13 12 months 9.78
37 i) Shri R. Vijayappan, Sc 'D' (Retd) Sc 'D' (Retd) “Amendment/Updating and Digitization of old drawings, specifications and QAPs of CSS and preparation of TOT documents” (Contract ARDE - 37 )
Remarks:
Review drawings, specifications amd QAPs oif CSS for LCA fighter, trainer and HJT-36 a/c which involve 200 drawings , 1750 pages of specifications and 100 pages of TOT documents
ARDE Apr-13 6 months 5.16
38 Shri SS Kulkarni, Sc 'F' (Retd) RR Gosavi, Sc D' VS Dhavalikar Sc . C Sc 'F' (Retd “Consultancyh Services for Product improvement of Adrukshy Mk II & Productionisation 30 mm HE Greneade for AGS-17 (RUDRA)” (Contract ARDE - 38)
Remarks:
Assist actual manufacture of coponents, filling as well assembly of units at OF Chanda including development of allied tools/fixtures and modification in coponents/sub-assembly drawings if found necessary. Assist in conduct of trials, clarifying users queries through interaction with them. Updating of TOT documents based on findings of analysis of users evaluation trials. Guidance to ARDE/Ord Factories for manufacture of 30 mm HE Grenade production lots & sentencing thereof.
ARDE Aug-13 05 Months 8.29
39 D. Sarkar Sc. 'E', VV Makhija, Sc 'D' Sc' E" “Consultancyh Services for Vetting of specifications of sub-systems for Gun, cost estimation, vetting of QA/QC documents of project Advance Tower Artillery Gun System (ATAGS) (Contract ARDE-39)
Remarks:
a) Provide assistance during cost estimation of various sub-systems (b) Scruitiny of specifications generated during development of various sub systems © Liaise with Development partners and research service providers during various development stages (d) Vetting of documents generated during inspection of components and equipments.(e) Attending trials, meeting, generating and Analysis of Trial result
ARDE Oct-13 12 Months 8.86
40 Dr. K.V. Prabhakaran, Sc.'E' (Retd) Technical Support for Development of EFP Warhead (Contract ARDE-40)
Remarks:
Study & optimise the design of P-Charge with steel liner having diameter 140-150 mm and to evaluate its lethality against steel targets at stand off distance of 125 m.
ARDE Dec-13 10 months 4.07
41 Shri. RJ Kenkre Sc. 'D' (Retd) Consultancy in preparation of technical documents like specifications, proof schedules, scrutiny of drawings and Quality Assurance Plan etc. and assistance in procurement of items at various stages of development, manufacturing and trials (Contract ARDE-41)
Remarks:
Preparation of technical documents like specifications, proof schedule, scruitiny of drawings and Quality Assurance Plans etc. and assistan ce in procurement of items at various stages of developnent, manufacturing and trials.
ARDE Dec-13 15 months 6.50
42 Maj. Gen. D. Kapil, AVSM Brig. (Retd) Acquisition of Professional Services for CFD Analysis of 120 mm FSAPDS Ammunition (Contract ARDE-42)
Remarks:
i) Parametric CFD / FEA software code for a. Internal ballistics, Forces and moments generated during in-bore travel of shot and stress analysis of complete shot & dynamics of the shot assembly). b. Internal ballistics, considering variables viz. position of CG, width of CB/DB, distance between CB & DB, length of sabot, unsupported length of penetrator at aft and fore, diameter of penetrator, length of penetrator, mass of projectile (sabot, penetrator, tail, CB, DB), friction between barrel and driving band with rifling, Torque due to rifling, wear of barrel ( I, II, III, IV qtr), mechanical properties of all components at high strain rate, Pressure time, pressure space curve at -100 C, 270 C (amb), +55 0 C. Modal analysis/vibrations of projectile under different pressure loads with above variables. ii) Generation of parametric codes for detailed analysis of internal balloting by considering the above variables for predicting successful launch, accuracy and consistency. iii) The estimation of pressure-load distribution on sabot after ejection of shot from muzzle. iv) Estimation of aerodynamic load required for breaking of centering band, Driving band and in-situ moulding with shock capturing considering temperature due to friction of barrel. v) The stress distribution in sabot petals before the initiation of sabot discards. vi) ARDE will be provided with the Hard & Soft copy of the Codes with detailed description of inputs & output. vii) Training of ARDE scientists on the software.
ARDE Dec-13 24 months 75.07
43 SS Pol TK Ghosh, Sc.'E' (Retd) “Acquisition of Consultancy Services for New Family of Munitions (ARDE-43)
Remarks:
Services/assistance in preparation of User Trial hardware/Trial directive & conduct trials NIPUN, Vaibhav, Vshal, ULKA projects. Modification & Design Preparation of trial plans finalizing Fixtures for the above projects.
ARDE Feb-14 3 Months 2.50
44 SS Pol TK Ghosh, Sc. E (Retd) Consultancy Services for verification of ISO Documents, Drawings & QAPs and trial reports of NFM Tech Division ARDE-45
Remarks:
Services/assistance in generation and verification of documents, Quality reports, trial reports etc. as per ISO requirement for the NFM Tech Division. Services/assistance inchecking and verification of drawings and quality Assurance Plans for the NFM Tech Division
ARDE Jul-14 3 Months 4.04
45 AA Ghosh, Sc. 'G' Design & Technical Support for Development of Software for Mangement Information System (MIS) DG(ACE)-1
Remarks:
Project Management System for DG(ACE) unit - Requirement Analysis, Project Proposals (Storage & Retrieval), Project Booking, Commitment & Expenditure, Project Status and Monitoring at DG(ACE) Unit. Sanctions/approvals of MM in DG (ACE), HRM for all cluster under DG(ACE) Unit. HRD expenditure Management.
DG(ACE) Jul-14 18 months 9.51
46 S.S. Kulkarni Sc. 'F' (Retd) Consultancy Services for Product Support for productionisation of Adrukshy Mk-II (ARDE-46)
Remarks:
Service /assistance for AHSP duties to establish the defect free production of Adrukshy Mk-II. Assistance in Design & Development of gauges and jigs , Fixtures, etc for inspection. Assistance for explosive filling, fabrication, finalisation procedure for HE filling, Inspection hardware components of Adrukshy Mk-II
ARDE Mar-15 20 Months 22.38
47 Sh. SS Pol . Sh. TK Ghosh Sc. 'E' Acquistition of Consultancy services for New Family Munitions (ARDE-47)
Remarks:
Assistance for preparation of filled assembly drawings and their quality Assurance Plans. Prepared Trials Plans. Inspection & Checking of components of prototype under manufacture at manufacturers site as well as in -house. Assistance for evaluationtrials of system of ARDE, HEMRL and CME Pune.
ARDE Feb-2015 11 Months 9.79
48 CM Kulkarni, Sc. 'F' Technical Services for assisting in weighing, filling, assembly and conducting the various trials of Power Catridges (ARDE-48)
Remarks:
Work assitance in trials and filling of catridges. Inspection of hardware. Visual Inspection of hardware . Preparation of trial stores.
ARDE Feb-15 7 months 8.78
49 R Vijayappan Sc. D Amendment/Updating and Digitization of old drawings, specifications and QAPS of CSS and preparation of TOT documents (ARDE-49)
Remarks:
Review drawings, specifications amd QAPs oif CSS for LCA fighter, trainer and HJT-36 a/c which involve 150 drawings , 1000 pages of specifications and 100 pages of TOT documents
ARDE Jun-15 4 months 2.52
50 RR Gosavi KK De Sc. 'D' (Retd) Techinical Services for Development Activities of PARTH & PRACHAND Device under NFM (ARDE-52)
Remarks:
Consultancy for design of tools, fixtures and test jigs for carrying out environmental testing of different sub system of PARTH & PRACHAND. Assistance in inspection of raw materials and Certificate of Conformance.
ARDE Jun-15 8 months 7.87
51 RJ Kenkre, Sc D (Retd) Sc D (Retd) Consultancy Services for Development Activities for 'Advanced Towed Artillery Gun system (ATAGS)- ( Contract ARDE-53 )
Remarks:
To assist in preparation in specifications for procurement of various stores. Prepared and vetted QA/QC documents for ammunitions and other components and assemblies. Assisted in preparation of technical documents like closing report, cost estimation and ISO documents etc.
ARDE Mar-16 11 Months 9.93
52 SS Pol TK Ghosh, Sc. 'E' Consultancy Services for Vaibhav, Vishal & Ulka Project ( Contract ARDE-54)
Remarks:
Services/assistance in inspection,testing & preparation of store in bulk quanitity. Inspecting, Testing & preparation of store in bulk quantity. Services/assistance in preparation of hardware for UATT
ARDE Mar-16 3 months 3.12
53 RR Gosavi K.K. De Sc. D Consultancy Services for Path & Prachand Device under NFM Projects (Contract ARDE-55 )
Remarks:
Scruitiny & vetting of documents as supplied by development partner as per finalized QAP. Assistance in preparation of drawings and its finalization. Assitance/guidance of techn ical/field trials. Assistance/guidance in generation and analysis of trials result.
ARDE Jul-16 5 months 4.63
54 T.K. Ghosh, Sc. 'E' Consultancy Services for Vaibhav, Vishal & Ulka of NFM Projects (Contract ARDE-56 )
Remarks:
Services, assistance & monitoring in preparation of hardware of Vibhav & Vishal. Services & assistance during conduct of Lab level User trials at ARDE and field trial at CME. Inpection & testing of Ulka hardware . Scruitiny of Inspection reports of all items. Services assistance & support for trials conducted at Pashan ranges including Fork lift operation
ARDE Jul-16 5 Months 4.53
55 DK Dattagupta KK De Sc. E (Retd) QA/QC support for 155 mm X 52 caliber gun Advance Towed Artillery Gun System(ATAGS) ( Contract ARDE-57 )
Remarks:
To carry out QA/QC as per the approved documents, of the items pertaining to Ordnance and recoil system, being manufactured at different work centers
ARDE Dec-16 3 months 8.14
56 TK Ghosh, Sc. E (Retd) Consultancy Services for NIPUN, Vibhav & Vishal & Ulka of NFM Projects. ( Contract ARDE-59 )
Remarks:
Preparation and Finalisation of Drawings, Inspection & Acceptance Test Plans , services/assistance in scruitiny of Inspection reports, Services, assistance during conduct of Lab level User tgrials at ARDE.
ARDE Mar-17 12 months 9.69
57 SS Kulkarni VS Dhavalikar Sc. 'F' (Retd) Consultancy Service for Productionisation of Adrukshy MK-II- (contract ARDE-58 )
Remarks:
Execution of production of 5000 mines as initial lots. In-house tests and proof of lots and influence Fuze for the batch of 200 Nos. Assistance in the filed for conduct of trials at Users locations for evaluation of mines. Guidance for explosive filling of warhead, Earth Clearing charge, Electrical Delay Detonator & Booster pellet of OF Chanda.
ARDE Jan-17 12 Months 9.25
58 R.R. Gosavi Tara Singh Sc. 'D' (Retd)) Consultancy Services for Development Activities of PARTH& PRACHAND Device under NFM (Contract ARDE-60)
Remarks:
Assistance in preparation of drawings of 50m lethal warhead and its field testing. Assistance/guidance in generation and analysis of trial results. Consultancy for design of tools, fixtures and test jigs for carrying out environgmental testing of different sub systems of Prachand - Vibration fixture of mechanical timer. Vibration fixture for Prachand Module. Wooden fixture for RF Antenna module raidation pattern measurement. Assistance in assembly of RF Sub-system. Consultancy of TIMER assembly, inspection, testingand evaluation for 400nos.
ARDE Mar 17 12 Months 9.72
59 RJ Kenkre, Sc. D (Retd) Consultancy Services for Development Work of project Corner Shot Weapon system(CSWS) - ( Contract ARDE-61)
Remarks:
Preparation of Specification for procurement of various stores. Scruitiny of drawings of components and ammunitions. CFD Analysis Stress Analysis of Components. Preparation of Technical documents like Trial analysis report, cost estimation. Inspection & updtion of quality records for ISO. Liasion with Development & Procuremetns partners & various departments in Establishment.
ARDE Apr-17 11 Months 9.70
60 Tara Singh Sc. 'D' (Retd) Technical Services for Testing of Electronic fuze modules of mun itions/mines and Field trial activities of PRACHAND Device under NFM ( Cntract ARDE-62)
Remarks:
Assistance in preparation of trial plan and field testing. Assistance/guidance in generation and analysis of trial results. Assistance in testing of Electronic modules, their lab and field testing along with generation of technical reports for analysis. Assistance in Environmental testing of Electronic modules. Assistnce in Hardware (Electonic) for Mark-II,Activities of Pravate Production Agencies and at OF Chanda. Assistnce in conduct of Proof trials at manufaturers end. Lab & Field trials of PRACHAND subsystem, prototype and packaging.
ARDE Jan-18 10 months 9.35
61 Shri V B Ghorpade Sc. 'G' (Retd) "Consultancy of generation of definition dossier and design documents for launch system of AGNI Variant." (Contract ASL - 1 )
Remarks:
• Structural design of suitable rail wagon for the launcher • Design of launcher structure and various mechanisms • Design of hydraulic and pneumatic systems • Design of electro-mechanical and electrical systems • Finalisation of design configuration after due consultation with various agencies • Instrumentation • Trials, tests and evaluation of the Prototype
ASL Dec-07 18 Months 9.75
62 Dr R N Sarwade Sc. 'E' Consultancy services for Optimization of Arjun MBT Fuel system." (Contract CVRDE - 1 )
Remarks:
Work done :- Geometry modeling/clean-up, simplificatgion of tank, ducting pumps, filter etc. Develolpemnt of model and base case simulation. Configuration modifications simulation. Report in the form of power point presentation and an ehaustive hard copy along with soft copy of the models and simulation carried out in compatible format given to CVRDE.
CVRDE Sep-11 4 months 9.93
63 Shri R S Chauhan Sc. 'F' (Retd) "Consultancy for Development of photo as well as bio-degradable polymeric packaging materials for high altitude and low temperature applications." (Contract DRDE- 1 )
Remarks:
• Development of biodegradable material which will have properties of polyethylene which is most suitable packaging material both from service life as well as cost. • Synthesizing suitable compatibilizer with suitable melting temperature to make compatible blend of LDPE and HDPE • Incorporation of reinforcing agent in the blend • Development of starch based material for the blend • Establishing techniques for manufacture of films of required thickness using melt-blow film making machine • Evaluation techniques using IR spectroscopy, SEM, LRS and X ray spectroscopy and to test the material for heat sealing, package behaviour and for oxygen permeability
DRDE Oct-05 12 Months 4.15
64 Shri Kishan Singh Sc. 'D' (Retd) "Consultancy for modification and modification & improvement in bio-digester for Indian Railways." (Contract DRDE - 2 )
Remarks:
Prepared drawings and specifications incorporating damping, heating system and interfacing of two toilets. Prepared QA/QC doucment. Provided guidance during critical stages of manufacturing. Prepared Documentation & Manuals.
DRDE Dec-05 08 Months 3.86
65 Shri R S Chauhan Sc. 'F' (Retd) "Consultancy for Design & Development of compatible blends for the introduction of photo-degradabilityin HDPE, MDPE & PP Polymers ." (Contract DRDE-3 )
Remarks:
• Development of compatible blends for Introduction: of photo degradability in high density polyethylene (HDPE) medium density polyethylene (MDPE), and poly propylene (PP) • Design of suitable compatibilizer with processing properties of HDPE, MDPE and PP • Preparation of films from the polymers and evaluate their photo degradability
DRDE Dec-06 18 Months 4.71
66 Shri P M Bhat Sc. 'F' (Retd) "Preparation of a Technical Multimedia presentation of Bio-digester developed by DRDE." (Contract DRDE- 4 )
Remarks:
Prepared List of important parts and subsystems used in Bio-Digester.Prepared visual Multimedia display . Prepared a brief writ-up oc each of these parts and subsystems -salient features etc
DRDE Apr-08 6 Months 7.86
67 Shri D K Dattagupta Sc. 'E' (Retd) TC/ DKD-P/IDST-21/ 2010 Dt.- 19 March 2010 For "Preparation of a Technical Document and Multimedia presentation of Equipment developed by DRDE for common Man Use" Contract DRDE - 5, Multimedia Equipments
Remarks:
Prepared a list of important equipments developed by DRDE Dir prerepared Audio/vedio Script , Video shooting at the premises of DRDE. Voice Over recording & Editing done. Prepared a brief write-up on each of the above equipements and subsystems. Arranged them in a systematic chronological order to make it impressive for viewing by the visitors and also by the media. Prepared visual multimedia .Carried out shooting of various items in user mode. Multimedia presented DRDE in English & Hindi
DRDE Mar-10 05 Months 9.37
68 i) Shri D K Dattagupta, Sc 'E' (Retd) “Preparation of Multimedia presentation of Products and Technologies developed by Entomology Division DRDE, Gwalior for Service Personal and Common man.” (Contract DRDE - 6 )
Remarks:
Prepared a list of products and technologies for which multimedia to be prepared. Video shooting at the premises of DRDE. Voice Over recording & Editing done. Prepared a brief write-up on each of the above equipements and subsystems. Arranged them in a systematic chronological order to make it impressive for viewing by the visitors and also by the media. Prepared visual multimedia .Carried out shooting of various items in user mode. Multimedia presented DRDE in English & Hindi
DRDE Jul-11 7 months 8.79
69 Dr. H S Yadav Sc. 'G' (Retd) "Theoretical study on Kinetic Energy Projectile." (Contract HEMRL- 1 )
Remarks:
1. (a) Initiation of explosive by KE Projects (b) Interaction of KE projectiie with obliquely mov ing metal plates. 2. (a) Deflection of a K.E. Projectile due to impact of an obliquely moving metal plate (b) Total time of interanction of KE projectile with metal plate (c) Length of plate cut in top & bottom plate of ERA sandwich
HEMRL Feb-06 6 Months 2.54
70 Shri U S Pandit Sc. 'E' (Retd) "Provision of professional services for development & evaluation of 84 mm incendiary rounds with dual incendiary & suffocating fume effects ." (Contract HEMRL - 2 )
Remarks:
• Development of incendiary composition using zirconium, red phosphorous as its base and sticky incendiary composition to achieve suffocating effect • Establishing methodology of production for bulk quantity and establish QA procedures for the same. This involved pellet preparation of composition, assembly of shells and crimping of cartridge case to shell. • To ascertain compatibility of fuzes and establish methodology of filling the fuzes and evolve QA procedures • Dynamic firings by setting angle of fire, range etc.
HEMRL Mar-06 16 Months 6.00
71 Shri K K De Sc. 'D' (Retd) "Professional Service for development and establishment of Nickel Hydrazine Nitrate (NHN) based tubular detonators" (Contract HEMRL- 3)
Remarks:
• Fine tuning of actual formulation and filling parameters based on proof results and production of 10000 Nos of detonators at AFK • Filling and crimping of detonators • Conducting dynamic firing trials • Finalisation of TOT documents including QA aspects of raw materials
HEMRL Mar-07 11 Months 3.18
72 Shri P M Bhat Sc. 'F' (Retd) "Preparation of professional document and multimedia presentation and document on HEMRL achievements." (Contract HEMRL- 4 )
Remarks:
•Prepared a list of important product & technologies developed by HEMRL . •Prepared a brief write up on each of those itesms- salient features, functional aspects area of application and spin off benefits • Arranged them a systematic chronological order to make it impressive for viewin by the visitors.• Prepared a visual display in the form of multi media display of the above.• Multimedia presentation and document as above completed.
HEMRL Mar-07 8 Months 6.04
73 Shri A K Mondal Sc. 'G' (Retd) "Consultancy for Generation of Process and QA & QC Documents, for various Propellants for Air Booster, Gas Generator, Under Water Booster, Nose Cap Separation Motors, Retro Motors & Pyrogen Igniter grain." (Contract HEMRL- 5 )
Remarks:
Prepared document for generation of process and QA&QC documents for Air Booster, Gas Generator, Under Water Booster, Nose Cap Seperation motors, Retro motors and Progen igniter grain - The task completed successfully.
HEMRL Sep-07 12 Months 4.38
74 Dr H S Yadav Sc. 'G' (Retd) "Consultancy on Theoretical Study for determining explosive's Hugoniots from their Isentrops" (Contract HEMRL )
Remarks:
Developed insentropic equation of state of the explosive from their experimental shock data . Derived the relationship ofa a&b Linear relation Us=a+b Up with the constants of the isentropic equation of state
HEMRL Sep-07 6 Months 2.83
75 Dr Haridwar Singh Sc. 'H' (Retd) "Preparation of text document and supply of book (300 nos) on Glorious five Decades of HEMRL (1958-2008)." (Contract HEMRL- 7 )
Remarks:
• Brief History of IIEMRL since 1908 • Write-ups on MRL detachment activities. • Genesis of High Energy Materials and MRL’s contributions. • Pilot Plant processing activities. • Scientific technology developed by MRL • Skill enhancement of personnel. • Recognition of awards with photographs. • Publication of Patents , papers ( in National & International Journals ), Books. • Inclusion of photographs of VIP Visits / Dignitaries and photographs of Nainital buildings (old and new). • Reminiscences from Retd Senior Scientists / Retd Directors. • Achievements in Sports / Societal activities. • Reference books — DRDE, PXE, NPOL books A professionally prepared documentation in the form of t highlighting the Lab’s achievements would be the best tool for boosting the image of DRDO and MRL to the outside world.
HEMRL Apr-08 9 Months 9.97
76 Shri A K Mondal Sc. 'G' (Retd) "Consultancy for Generation of Process and QA & QC Documents" (Contract HEMRL - 8 )
Remarks:
• Consultancy for the preparation of documents on details of raw materials, processing, Quality Assurance, and Quality Control Tests as follows; • Consultancy for preparation and review of process and QA/QC documents for propellant and igniter of propulsion system of Extended Range rocket system The documents will cover raw materials and processing details, evaluation/tests procedures, A/QC aspects and inspection procedures. • Consultancy for preparation and review of documents for raw materials and processing details, QA/OC aspects and inspection procedures for the propellant and igniter of SRSAM propulsion systems.
HEMRL Jan-09 12 Months 4.90
77 Dr B R Gandhe Sc. 'G' (Retd) "Consultancy for Generation of Process and QA & QC documents, (HEMRL/PSQR//2010/SRP/1" (Contract HEMRL - 11 )
Remarks:
a) Preparation and review of process and QA/QC documents for Igniters for LRSAM/MRSAM and NIRBHAY (b) Preparation and review of documents on process details, QA/QC, Quality Plan, Inspection procedures and acceptance criteria for propellant for LRSAM/MRSAM and NIRBHAY propulsion system
HEMRL Sep-10 12 Months 6.10
78 Dr B R Gandhe Sc. 'G' (Retd) Contract No. HEMRL/CAPSI/SRP/11-12/03 dated 28/10/2011 for "Consultancy for Generation of Process and QA/QC documents". (Contract HEMRL – 12, QA/QC Documents)
Remarks:
The consultancy/guidance was provided to the concerned Project Team members responsible for documentation for the project. The necessary contents of the Process documents for the propellants for Extended Range Pinaka/SRSAM and igniters for the same were explained to the project members responsible for preparing documents. The details of technical contents needed ub the document from the point of view of QA/QC and safety aspects and keeping in view for their large scale production were explained.
HEMRL Oct-11 12 months 6.25
79 Dr Amarjit Singh,Sc ?G? (Retd) Consultancy service for preparation and review of process and QA/QC document for 81 mm AT/AL smoke grenade and BMCS for 155 mm Howitzer and support and guidance to HEMRL teams for various trials (Contract HEMRL-13 )
Remarks:
Not materialised. Project Cancelled
HEMRL Feb-12 12 Months 7.81
80 Shri. R. B. Marathe Sc 'E' (Retd) “Consultancy Services for updating and digitizing of old drawings, specifications, proof schedules of the Pyrotechnic Delays and Preparation of TOT Documents (Contract HEMRL-14 )
Remarks:
IDST team reviewed drawings, specifications and proof schedules for the process of delay pressing. All drawings and specificatios and proof schedules carried out to eliminate the ambiguity . IDST supplied one set of digitized hard and soft copies of updated drawings/specifications/proof schedules and TOT documents to HEMRL
HEMRL Mar-12 04 Months 9.88
81 Shri R. K. Syal, Sc 'G' (Retd) “Provision of professional service for Development of Eco-friendly process for effluent treatment and solvent recovery from the effluents of RSS-RDX Pilot Plant” (Contract HEMRL -15)
Remarks:
Selection of method for recovery of dissolved RDX from the effluents. (b) Generation of know-how for eco-friendly treatment of effluents of RSSRDX Plant © Development of process for recovery of solvents from the efflents of RSSRDX plat and nio-degradation of effluents left after recoveryu of solvents to eco-friendly by products. (d) To design the process for effluent treatment and complete recovery of solvents for its scale up
HEMRL Jun-12 10 months 9.84
82 Dr. H.S. Yadav, Sc. 'G' (Retd) “Performance Prediction of Explosive Reactive Armour (ERA)” (Contract HEMRL - 16 )
Remarks:
The report submitted on a) Determination of shock wave parameters in sandwich metal plates duie to detonation of explosive in ERA ..b) Average velolcity of jet penetration in sandwich metal plates © Delay between jet impact and start of plate motion (d) Initiation delay of different explosive composition agsinst jet impact (e) Rate of crater expansion in the metal plate of ERA (f) Derivation of plate velocity in sandwich geometry (g) Lateral shifting of mjet in plate hole (h) Determination of jedt time to reach the cater wall. (i) Tip and tail velocities of the jet passing out so sandwich (j) Actual computation of performance parameters of typical ERA.
HEMRL Jul-12 10 months 6.37
83 Shri R B Marathe, Sc. 'E' (Retd) “Consultancy Services for Model Design Document for Automatic Filling and Pressing of Pyrotechnic Smoke and Delay Compositions.” (Contract HEMRL-17 )
Remarks:
Studied of various filling/pressing operations. Surveyed automatic machines. Prepared comceptual design document of proposed filling machine and model design document . A complete rep;ort including model design document, a hard and soft copy prepared and submitted to HEMRL.
HEMRL Sep-12 6 months 7.52
84 Shri C M Kulkarni, Sc. 'F' (Retd) “Technical services for preparation of CSS sets for LCA-Fighter and LCA-Trainer and preparation of Specification / documents/Drawings” (Contract HEMRL - 18 )
Remarks:
Preparation of circular MDC, shaped MDC, Explolsive Transfer Line, Filling of Central Booster, Tip Booster, conduction of radiography & lot proof and assembly. Preparation of Documents specifications/ drawings of machineries and processes involved in preparation of CSS.
HEMRL Feb-13 5 months 9.51
85 Shri. CM Kulkarni, Sc. 'F' (Retd) “Technical services for preparation of RAW materials & filling of MIGM warheads and preparation of documents/drawings/flow chart (Contract HEMRL - 19,)
Remarks:
Sieving and preparation of raw materials -1.5 tons (b) Filling of warhead -1 No. © Preparation of boosters -15 Nos (d) Transporation of raw materials and warheads for sieving, drying, filling, curing etc (e) operation of plant and machinery as required (f) Preparation of mixer from before and after mixing (g) Preparation of flow charts/drawing/documents etc.
HEMRL Aug-13 4 months 8.47
86 Shri. CM Kulkarni, Sc. 'F' (Retd) Technical services for preparation of CSS sets for LCA fighter and LCA Trainer and design of CMDC based MPI system Contract (HEMRL-20)
Remarks:
Preparation of circular MDC, -1000 , Preparation of shaped MDC-200 m, Preparation of ETLs as per project requirement, filling of Central Booster-300 Nos, Filling of Tip Booster-1000no. Assembly, conducting radiography of circuloar MDC , conducting lot proof, Design & evaluation of CMDC based MPI system, Design, verification trials of Conical TiP Boosters
HEMRL Nov-13 8 months 9.65
87 Shri. CM Kulkarni, Sc. 'F' (Retd) Technical services for preparation of CSS sets for LCA fighter and LCA Fifgther and Trainer Air Crafts ( Contract HEMRL-21)
Remarks:
Preparation of circular miniature detonation cord (CMDC) shaped miniature detonating cord (SMDC) explosive transfer line(ETL) filling of cen tral and tip b oosters, lot proof of different sub-system radiography design verification trials of concial tip boosters etc
HEMRL Nov-14 1.4 months 3.74
88 CM Kulkarni, Sc. 'F' (Retd) Technical Services for preparation of CSS sets for LCA fighter and Trainer aircrafts. (HEMRL-22)
Remarks:
Prepared circular MDC-120 m . Prepared shaped MDC-175m. Prepared ETLs-75 Nos.. Filling of Central Booster. Assembly of GES shaped MDS-20 Nos.
HEMRL Feb-15 4 months 5.31
89 CM Kulkarni, Sc. 'F' (Retd) Technical services for preparation of CSS sets for LCA Fighter and Trainer Aircrafts (HEM-23)
Remarks:
Preparation of ciruclar MDC-200 m (b) Preparation of shaped MDC-250m- Preparation of ETLS-120 No. Conducting radiography of ciruclar MDC, shaped MDC , and ETLIs. Conduction of lot proof above stores. Chemical analysis of SMDC.
HEMRL Jul-15 6 months 7.99
90 AA Ghosh, Sc. 'G' (Retd) Services to Monitor, Analyse and Generation of Data/Information on Servers through Software Applications. HEMRL-25
Remarks:
Study the existing MIS, procurement, budgeting, accounting and bill payments prevailing in HEMRL. Identifying the bottlenecks in the existing MIS , procurement & budget process , project approvals and PDC extensions. Study of Activities pertaining to delays in project, monitoring & analysis of data and suggesting remedial action to be taken to improve procurement performance. Assistance in compilation of all relevant budget data for projects and the laboratory . Preparation of cash outgo, and analysis and monitoring of delays.
HEMRL Jan-16 12 months 6.87
91 CM Kulkarni, Sc F (Retd) Technical Services for preparation of CSS sets for LCA fighter and LCA trainder Air Crafts HEMRL-26
Remarks:
Prepared circular Cords, Shaped cords, Transfer Lines, Central Boosters, Tip Boosters, Detonator Boosters, GES shaped cords Conducted radiography , conducted lot proof trials & chmical Analysis of circular nd shaped cords.
HEMRL Mar-16 7 months 7.83
92 S.S. Pundale Sc. "E' (Retd) Professional Services for "Automated Inspection & Assembly of BMCS Modues."-HEMRL-27
Remarks:
Material & preparation of specifications. Inspection& commissioning of sub-system like distance of sensors, data acquisition system, etc. Compilation of relevant data obtained from measuirement of components. Generation of drawing of components of each sub-system.
HEMRL Jun-16 17-months 9.55
93 Mizajilal Sc. 'F' (Retd) Document Management Sysem and Finger Print Based Bio-metric system. ( Contract HEMRL-30)
Remarks:
Professional services includes studying the existing IT Infrastructure available at HEMRL. Provide assistance in implementation of Document Management System & Finger print based Biometric systems. Providing traing pertaining to both the the systems. Technical Support services during installation of Bio-metric Systems.
HEMRL Sep-16 12-months 7.29
94 R. Vijayappan Sc. 'D' (Retd) Technical Services for processing of Inert Compositions ( Contract HEMRL-28)
Remarks:
Assistance in technical services during filling of inertion composition 500 Kg GP bombs and scale down models as per periodic supply of empties from ARDE. Weighing, Cleaning of the composition. Preparation of hardware . Inspectioin of filled bombs
HEMRL Sep-16 5 months 9.34
95 CP Achuthan Sc D(Retd) Technical Services for preparation of GES Sets for HTT 40 a/c - ( Contract HEMRL-31)
Remarks:
Preparation of Circular Minature Detonating Cords . Preparatikon of Shaped Miniature Detonating cords. Preparation of Explosive Transfer Lines, Preparation of Central Booster, Preparation of Tip booster, Preparation of Detonator Booster Assembly.
HEMRL Dec-16 5 months 5.82
96 AA Ghosh, Sc. 'G' (Retd) Services to support Virtualization of IT infrastructure. ( Contract HEMRL-32)
Remarks:
Provide support of capture all the information of all IT hardware and software deployed on the Campus network of the laboratory. Sizing of the virtualisation platform in terms of number of servers, client machines dynamic memory, storage and other parameters like operating system, application s and their licences. Support in terms of training of persons on Virtualisation Platform, VMware softare or any other Hypervisor identified for the purpose of virtualisation. The need for redundancy in terms of CPUs , Network switches/ports power supplies and other devices is also to be identified and documented.
HEMRL Jan-17 12 months 6.70
97 Dr. CP achuthan Sc 'D' (Retd) Tgechnical Services for preparation of Dual IES Sets for LCA Fighter& Trainer a/c ( Contract HEMRL-33)
Remarks:
Assistance in Preparation of Circular Miniature Detonating Cords, Shaped Miniature Detonating Cords, Explosive Transfer Line, Censor Booster, Tip Booster, Tip Booster Assembly, GES shaped cords , conduct of lot proof of above stores, Chemical analysis
HEMRL Jun-17 5 months 6.46
98 Dr. C.P. Achuthan Sc. D (Retd) Technical Services for preparation of GES sets for HTT 40 Aircrafts. ( Contract HEMRL-34)
Remarks:
Technical Services for preparation of Circular Miniature Detonating cords (CMDC) shaped Miniature Detonating cords(SMDC) , Explosive transfer lines (ETL), preparation of central boosters, tip boosters, conducting of radiography, lot proof and assembly of GES shaped cords.
HEMRL Dec-17 5 months 6.15
99 Dr. CP achuthan Sc. D(Retd) Technical Services for preparation for supply of 10 no. of CSS sets for LCA fighter and Trainer Air Crafts - ( Contract HEMRL-35)
Remarks:
Preparation of Circular Miniature Detonating Cords, Shaped Miniature Detonating Cords, Explosive Transfer Lines, Central Boosters, Tip Booster, Detonator Booster Assembly, GES shaped cords, Conduct of lot proof of stores, QA/QC reports
HEMRL Jan-18 3 months 2.90
100 Shri. AA Ghosh Sc. 'G' (Retd) Services to Support Setting UP and Configuration of Hardware and Software for Enterprise Level Project Management for the Projects in the Laboratory. -( Contract HEMRL-36
Remarks:
Technical Support and assistance to configure and document all the IT related Hardware and Servers along with the Application Software-Project client & Project Server, E-Mial server, Dcoument Management Server and the Data base Server to be deployed for the Enterprise Level Project Management Software on the campus network of the laboratory. Support to implement a suiatable mechanism for back-up and restore for the entire enterprise Level Project Management Software applications and its data.
HEMRL Jan-18 12 Months 6.56
101 Prof. G S Mani Sc. 'G' (Retd) "Consultancy for Radar Technology." (Contract ISSA- 1)
Remarks:
Director, ISSA wanted a consultancy in the form of group discussions on Radar Technology to be conducted for the Scientists of ISSA. After having preliminary discussions on various aspects, it was decided that this will b e taken up as a consultancy project under IDST. The Project was conducted in three modules
ISSA Jun-08 8 Months 1.89
102 Shri Suresh Chandra Sc. 'G' (Retd) "Consultancy in the field of Ballistics ." (Contract LRDE - 1)
Remarks:
• Development of Algorithms for weapon location of shells and mortars to obtain accuracy of 30x50 m fired from 10 to 20 km range • Application techniques for modeling rockets to improve the launch point accuracies • Refined techniques to be applied for modeling the rockets • Implementation of fire direction mode in weapon locating radar • Participation in evaluation trials.
LRDE Oct-05 12 Months 6.48
103 Shri D K Dattagupta Sc. 'E' (Retd) "Development of suitable heating device based on the existing technology to be used in cold regions for diesel fuel tanks of vehicles." (Contract NMRL- 1 )
Remarks:
• Development of heating pouch to heat the diesel fuel tank from subzero temp to the desired temp level. • Manufacture of device and conduct of tests and trials • Analysis of trial results • Application of the technology for fuel tanks of different capacities.
NMRL Jun-05 10 Months 4.80
104 Shri D K Dattagupta Sc. 'E' (Retd) "FEM analysis and experimental strain measurement of shaped Poly-LIST Dock Blocks." (Contract NMRL- 2 )
Remarks:
• Estimation and Analysis of compressive and shear strain of the dock blocks under vertical load • FEM analysis consisting of stress strain distribution in the blocks for static vertical and lateral loads • Static strain in two directions using the electrical resistance strain gauges in both normal and water conditions • Conduct of tests and analysis of results
NMRL May-07 11 Months 9.00
105 Shri K Verghese John Sc. 'F' (Retd) "Engineering Design Study and Prototype Development for Planar Methanol Reformer." (Contract NMRL- 3)
Remarks:
• Design of experimental model incorporating embedded electrical burners and controlling air and fuel ratio as per the heat requirements • Setting up of first reformer block consisting of reformer block, twin vaporizer block, blank burner plates, burner methanol pump, frame etc. • Computation and evaluation of heat flow of the system. • Model validation through evaluation on process conversion vs. reactant flow
NMRL Oct-07 10 Months 9.91
106 Shri K Verghese John Sc. 'F' (Retd) " Design of fuel cells for reliability engineering, product configuration and techno economic analysis" (Contract NMRL - 4 )
Remarks:
• Study of existing product • Evolve various design method and make an approach document for approval • Market survey on requirement and utility of the product planning and would approach for similar product. • Product design for optimum cost and optimal production method • Fabrication of subsystems and testing • Detailed design and drawing of full system with approved sub System
NMRL Nov-09 16 Months 9.88
107 Shri K Verghese John, Sc. 'F' (Retd) "Modeling Design Ruggedisation of 33 Kw PAFC for Marine Application" (Contract NMRL - 5 )
Remarks:
• Development of design, 3D model, detailed manufacturing drawings and evolving test methods to quality • Solid modeling for shock and vibration analysis by computational method • Design of jigs and fixtures for proper assembly • Design of test jigs and mounting methods to test shock, noise, vibration and other tests • Generation of fabrication drawings and development of prototypes • Development of detailed specifications and QC procedures and test methodology suitable for submarine environment • Documentation
NMRL Mar-11 25 months 25.16
108 Shri . DK Dattagupta, Sc. 'E' (Retd) Training on Meteorology and Oceanography Contract (PXE-1)
Remarks:
• Training on Basic Meteorology • Training on Adv Meteorology • Training on Oceanography
PXE Sep-13 6 Months 7.95
109 Shri M R Joshi Sc. 'G' (Retd) "Preparation of Manuscript and Printing of Book on R&DE (E) Titled Five Glorious Decades of R&DE (E)" (Contract RDE - 3 )
Remarks:
IDST assisted RE LAB in the analysis of Vendor data and generate a Dossier so that subject and attribute wise data is available online.• Mechanical • Electrical• Electronics• Computer• Hardware• Software• Robotics• Composites• Hydraulics & pneumatics• Misc / general• Documents• Stationery• Computer stationery• Consultancy• Transportation• Fabricators• Paints & hardware• Tools & accessories• Liveries• Hydraulic systems
R & DE (E) Aug-10 12 Months 9.92
110 Shri A V Tulajapurkar Sc. 'D' (Retd) "Preparation of e-documentation and solid modeling of Manually Launched Assault Bridge (MLAB) Components." (Contract R&DE- 1 )
Remarks:
Identification, Classification and Scanning of MLAB Project documents in TIFF format (14,000 pages and 16 documents) as per R&DE requirements. Conversion of 2D Auto CAD drawings into 3 D solid models in Solid works for 38 bridge components -760 drawings .Develop and provide search engines forf quick retrieval of data
R&DE (Engrs) Jul-07 8 Months 9.90
111 Shri A Basu Sc. 'E' (Retd) " Design of Pressure Vessels as per ASME, Quality Assurance for Materials Welding Technology and Coating for Application in Marine Environments for projects" (Contract RDE-2 )
Remarks:
• Identification, classification and scanning of project document in TIFF format • Conversion of 2 D AutoCAD drawings into 3 d solid models in Solidworks format for components and assemblies of the project hardware • Development and provision of search engine for quick retrieval data
R&DE (Engrs) May-10 12 Months 6.50
112 Shri A. V. Tuljapurkar, Sc 'D' (Retd) “Professional Services for Design of Tooling for fabrication and machining and Quality assurance for material and welding for Modular Bridge” (Contract - RDE-3 )
Remarks:
• Assist in formulation of specification and quality assurance documents for project components on a regular basis as per need. • Vetting of specification, drawings and quality Control documents submitted by vendor for conformance with QA documents on regular basis. • Preparation of revised technical specifications including all the changes during system realisation. • Expert advice on design of toolings for fabrication and machining of bridge components. • Inspection of project components and process at vendor permises at critical stages as and when required • Assistance in preparation of user handbook, MRLS, ISPL & complete schedule of equipment
R&DE (Engrs) Feb-12 12 Months 9.29
113 Shri K. C. Jacob, Sc 'D' (Retd) Professional Services for fluid power system design, manufacture, installation and commissioning for RAS system, Hydro-pneumatic suspension system, and maintenance and operation of Sarja hydraulic system. (Contract RDE- )
Remarks:
IDST team completed the contract as under: Technical interaction & feasibility study for manufacturing & testing of indigenous Pneumo-Hydraulic suspension (PHS) System with various vendors. Installation of Hydraulic power pack, Actuators, Accumulators and Emergency Power Pack of Motion Simulator ffacility for Launcher Testing (SARJA-II) at R&DE (E). Testing and performance evaluation (for 3OT pay load & upto Sea state-2) of complete hydraulic system of Motion Simulator facility for Launcher Testing (SARJA-II) at R&D(E)
R&DE (Engrs) Feb-12 12 Months 6.34
114 Shri H R Khadilkar Sc. 'F' (Retd) “Technical Documentation, Project Procurement and Project Management for Counter Mine Flail (CMF) Project”. (Contract RDE - 6 )
Remarks:
Assist in formulation of specification and quality assurance mdocuments for project components on a reguloar basis as per need. Vetting of specification and quality control documen ts sub mitted byh vendor regualar basis.Expert advice & guidance. Inspection of fabrication . Project management on a regular basisand coordination. Technical Support services .
R & DE (E) Jul-11 16 months 9.74
115 Shri A Basu Sc. 'E' (Retd) Contract No. S21152 Dt: 14/7/2011 for "Professional Services for “Qualitative Requirement for expert in Design of Pressure Vessels as per ASME, Quality Assurance for Materials, Welding Technology and Coating for Application in Marine Environments for Projects". (Contract RDE - 7, Pressure Vessels QA/QC)
Remarks:
• Assist in formulation of specification and quality assurance documents for project components on a regular basis as per need. • Vetting of specification and quality control documents submitted by vendor for conformance with QA document on regular basis. • Expert advice on design pressure vessels as per ASME code and assist in finalization of design by project officers. • Review of project components and process at vendor premises at critical stages as and when required
R & DE (E) Jul-11 12 months 7.22
116 Shri V B Ware, Sc. 'F' (Retd) "Professional assistance in Development of Self Propelled Mine Burier, Bar Mine Layer and Minefield Marking Equipment Mk II". (Contract RDE – 8 )
Remarks:
Assisted in formulation of specification and qualiity assurance documents for project components on a regular basis as per need.Vetting of specification and quality control documents submitted by vendor on regular bssis. Prepared revised technical specifications incorporating all the changes during system relization. Expert advice and guidance on design aspects of the equipments. Prepared documents for the equipments viz. User Hand Book, Definition Dossier, Training Manual, System Integration plan etc.
R & DE (E) Sep-11 18 months 9.74
117 Shri K C Jacob,Sc. 'D' (Retd) Professional Services for design, realization, testing, & trials of hydraulic systems for projects hydr- pneumatic suspension, replineshment access system & maintenance and operation of Sarja hydraulic system. (Contract RDE-9 )
Remarks:
• Finalisation of the design • Improvements and modifications to the system components and subassemblies • Commissioning and evaluation of the hardware • Documentation
R & DE (E) Jun-12 12 months 6.34
118 Shri A Basu, Sc. 'E' (Retd) "Professional services qualitative requirement for expert in quality control of materials welding, manufacturing and surface treatment / coating of ferrous and non-ferous materials and conversant with ASEM / ASTM / DIS Codes and specification (Contract RDE-10 )
Remarks:
Participated for eavaluation of technical bids for RML launcher Mk-III. Studied various aspects of policy document on environment test specifications of electrial equipment for GSESF. Finalised the various sizes and test specifications as p;er EN code for conducting impact test of material samples of STE460 cylinder material. Scruitinized the QAP snf ATP document of RML Mk-III
R & DE (E) Sep-12 12 months 8.82
119 Shri H R Khadilkar, Sc. 'F' (Retd) “Technical Documentation, Project Procurement and Project Management for Counter Mine Flail (CMF) Project” (Contract RDE-11 )
Remarks:
Helped Project-team in collection of stores received agaisnt supply orders. Worked with the team in the blast-trials of CMF eqpt. Participated in providing logistic/technical support during preparation and dispatch of Mine Warfare Edqpts for UATT. Mainteance of Tanks held by the R&D(E) Upkeep of Fork Lifter bnought in the project and movement of project and trial stores.
R & DE (E) Nov-12 15 months 9.78
120 i) Shri N M Hariprasad Sc. 'F' (Retd) “Professional Services for implementing setup of test beds for testing engines and motors with latest computerized testing & monitoring system and conduct of tests for Engines & Motors.” (Contract RDE - 12 )
Remarks:
Professional Service for implementing set up of test beds for testing of Brushless D.C. Motor as well P.C. based Engine System which control functioning of SCHENCK Model W-400 Dynammeter was carried out at R&DE(E), Dighi. During test trials with Dynamometer, problem of generating inadequate torque of 35 nm as against rquired 40 nm was rectified. Also test trials of PC engines carried out at manufacturing site for controlling functioning of SCHENCM Model 6 BTY AA 5.9, G-5 Diesel Engine Dynometer with various tests. Further work is still in progress.
R & DE (E) Dec-12 6 months 6.71
121 i) Shri Kishan Singh Sc. 'D' (Retd) Professional services for assistance in Manufacturing of Mechanical Systems for various weapon systems programme. (Contract RDE - 13 )
Remarks:
Preparation of Manufacturing Processes for Launch Beam of Army Akash Launcher (AAL) . Flow Chart prepared for AAL. Vetting Drawings for AAL. Inspection of manufactured system AAL.
R & DE (E) Feb-13 12 months 9.68
122 i) Shri K R Sivan Sc. 'E' (Retd) “Technical documentation, Procurement and Project Management for 46 m MLC 70 Modular Bridge”. (Contract RDE - 14 )
Remarks:
• Formulation of specification and quality assurance documents for components and subassemblies • Vetting of specification, drawings and quality control documents submitted to vendors for conformance with QA documents • Preparation of revised specifications based on system realization • Design of tooling for fabrication and machining of bridge modules In – situ Inspection of components at production site • Tests and evaluation
R & DE (E) Feb-13 12 months 9.82
123 i) Shri R M Dhodia Sc. 'E' (Retd) Professional Services of experienced Scientiest for fabrication, welding, inspection, testing, trials and technical ci-ordination work with respect of development of “ Agni” Missile Launcher and ITS variants." (Contract RDE - 15 )
Remarks:
Assisted Scientists & Technical Officers in input requirements of documets of A2 Mk-II as well as TCL-A3 'AGNI' launchers. Scruitnised TCL-A3 documents and necessary changes made.Compiled and scrutinised all input requirement of A2 Mk-II launcher documents. Prepared Technical specifications, ATPS, QAP and Testing of various system/subsystem .
R & DE (E) Sep-12 10 months 9.47
124 Shri. V.B. Ware Sc. 'F' (Retd) Professional assistance in Development of Self Propelled Mine Burrier, Bar Mine Layer and Minfefield Marking Equipment Mk-II (Contract RDE - 16 )
Remarks:
(a) Preparation of User and Production documents (b) Changes in the documents accoridng to modiifications during various trials. © Translation and preparation of User Hand Book. Technical Manual and Training Manual in Hindi (d) Participation in meeting with vendors regarding technical issues. (e) Inspection and testing of various sub-assemb lies and completed prototype (f) Checking of documents w.r. to JSS 0251 (g) Checking various procedure like DP test, Radiography, Painting etc. to meet requirements of ATP/QAP (h) Review of inspection and test reports w.r.t ATP/QAP (io) Other technical support serviees in the process of Users trials and production of equipments.
R & DE (E) Jun-13 18 Months 9.65
125 Shri. N.M Hariprasad Sc. 'F' (Retd) Professional Services for Implementing setup of test beds for testing engines and motors with latest computerised testing & monitoring system and conduct of tests for Engine & Motors (Cntract RDE-17)
Remarks:
a) Installation and Commissioning of PC Base Engine Testing System (b) Installation PC Base Enging Testing System © Commisioning Fuel consumption meter at various test level (d) Selection of dynamometers as per poer of the eingine or motor. (e) Coupling of the engine and motor with dynamometers. (f) Calculation of load to be put on the engine or motor through dynamometers. (g) connecting temperature probes pressure transducer to engine/motor (h) Render help of details of available. (i) Conduct various tests.
R & DE (E) Jul-13 6 months 8.20
126 Shri. M.A. Sinare Sc. 'D' (Retd) Professional Services for Technical Studies on development of Aluminium Alloys for structural applications and project management for 46 M MLC 70 Modular Bridge ( contract RDE-18)
Remarks:
a) Association and assitance in conducting the literature survey for selecting the suitable alloy for structural applications which are useful for design and development of futuristic Military Bridges. (b) Assist in conducting research and experimentation work in formulatin g technical parameters and specifrication of AL. alloys. (c) Assist Laboratory experimentation (c) Assist technical paraters like chemical cop;ositions, mechanical properties and metallographic structure of AL. alloys. (d) Prepare technical documentation, (e) Assist Project management of 46 m MLC 70 Modular Bridge (f) Assist conducting tech. trials.
R & DE (E) Aug-13 15 months 8.80
127 Shri. R.M. Dhodia Sc. 'E' (Retd) Professional Services for Experienced Senior Scientists well con versant for fabrication, welding, inspection, testing, trails and technical co-ordination work for documents with respect of development of "Agni" Missile Launchers and its variants (Contract RDE-19)
Remarks:
a) Guide and assist Scientists & Technical personnel in various stage of manufacturing, process planning, testing & trials including safety during handling trials. (b) Scrutinise manufacturing drawings for in process Inspection © Compile all material testing reports & random check thereof (d) Monitoring welding process/tecjniques adopted byh the firm for critical weld joints & further inspection as per ATP/Specification/codes (e) Inspection of bought out items/sub-assemblies.,, fitment & testing. (f) Compilation of all inspection reports and preparation of documents (g) Collection of compilation and scruitiny of all input datas from project/sub groups for various system of "Agni' Launcher.
R & DE (E) Aug-13 10 months 9.44
128 Shri. A. Basu Sc. 'E' (Retd) Professional services qualitative requirement (PSQR) for expert in Design Codes/Specification for Mechanical and Hydraulic Systems and process plan and control for manufacture of AGNI Systems (Contract RDE-20)
Remarks:
Study and advice on design and development of Engineering systems conforming to international standards and coes like ASME, EN, DIN and BS etc. Guide and assist scientists and technical officers in selection of materials, p;rocesses, quality control and inspection and testing norms. Review of project components and process at vendor premises at critical stages.
R&DE (Engrs) Jan-14 12 months 5.84
129 Shri. KC Jacob Sc D(Retd) Professional services qualitative requirement for expert in Fluid Power System Design, Manufacture, Installation, Commissioning, Testing & Trials of Hydraulic Systems for Projects under programme AD, such as Ship based Launcher for Floating Test Range & PDV Laucher (Contract RDE-21)
Remarks:
Assistance in finalizing the design. Suggested improvement/modification, if required, at the time of execution. Associated during preparation of final documents such as operation and instruction manual. Reviewed project program and p;rocess at vendor's premises at critical stages.
R&DE (Engrs) Apr-14 12 months 5.10
130 Shri. Kishan Singh Sc. 'd' (Retd) N21452 dt. 07/4/2014- Professional Services for Assists in Manufacturing of Mechanical Systems for various weapon systems Programme (RDE-22)
Remarks:
Guidance & associate in manufactguring of mechanical engineering systems in hojse and at vendors premises. Scruitinizing the technical documents process sheets and parameters executed by the manufacturer during welding operations viz. Welding Tgechnique/p;rocess adopted , Weld Electrodes, Electrical Set Parameters adoption of weld positions, sequential welding and quality of jigs & Fixtures/clamps etc. Guidance manufacturer to prevent/minimise distortion during welding and suggest improvements in the proceses for the manufacture/p;roduction of the products, adopted by the vendors. Machining of various components and elements incorporated in the design of roller type screws.Vetting of Drawings prep;ared by the Designer/Contractor.
R&DE (Engrs) Apr-14 12 months 8.80
131 HR Khadilkar Sc 'F' (Retd) Professional Services Qualitative Requirement for Technical Documentation, Project aprocurement and Project Management for Counter Mine Flail (CMF) (Contract RDE-23)
Remarks:
Preparation of RFPs for all procurements against project. Advice and gudiance on p;rocurement policies and methodologies for various systems of the project. Formulation of specifications and quality assurance documents for project -coimponents on need basis. Vetting of specifications and qulaity control, documents submitted bby vendor or regular basis. Inspectiopn of fabrication p;rocess at vendor's premises at critical stages on need basis . Project Management.
R&DE (Engrs) Apr-14 16 months 9.40
132 K.R Sivan Sc 'E' (Retd) Technical documentation, Project Management and Procurement for second system of 46 M, MLc70 Modular Bridge under MBG with Technical Support Services (Contract RDE-24)
Remarks:
Assistance in scruitiny & preparation of all m anuals related to the project such as: 1) Technical manuals , User hand Book, Complete Equipment Schedules, Maintenance Manual, Illustrated Spare Parts List. Definition Dossier, Manufacturers Recommended List of Spares
R&DE (Engrs) May-14 9 months 9.48
133 RM Dhodia, Sc 'E' (Retd) Professional services for fabrication , Welding, Inspection, Testing, Trials and Technical coordination work for documents with respect to development of AGNI Missile Launchers and its variants as well as coaches/wagon (RDE-25)
Remarks:
To guide and assist Scientists & Technical Personnel in various stage of manufacturing process planning, inspection, testing and tgrials including safety during handling/trials. Compile all matgerial testing reports & random check thereof. Monitoring of welding p;reocess/techniques adopted by the firm for critical weld joints & further inspection as per ATP/Specificationh/codes. Inspection of sub assemblies, fiotment & testing.
R&DE (Engrs) Oct-14 18 months 17.15
134 V.B. Ware Sc. 'F' (Retd) Professional assistant in development of self propelled Mine Burier, Bar Mine Layer, Mine Field Marking Equipment Mk-II and Counter Mine Flail. (Contract RDE-26)
Remarks:
Compilation of ISPL for MFME MK-II & SPMB considering all the modifications suggested in UATT & QIM interationcs. Preparation of revised specification & Quality control documents including all the changes during system relaisation & user trials for following projects (1) BML (ii) MFMEMK-II (iii) SPMB (iv) CMF. Preparation User Hand Book , QA/QC douments , Inspection of CMF components & Process at vendor premises as and when required.
R&DE (Engrs) Jan-15 18 months 9.65
135 MA Sinare Sc. 'D' (Retd) Professional assistance in revising and updating of technical documents and drawings of modified sub-systems of Sarvatra Bridging System. ( Contract RDE-28 )
Remarks:
Assistance in revising and updating of technical documentation for modified sub-system of Sarvatra bridging system. Assistance in revising of drawings of components and sub-system for production of Sarvatra bridging system. Assistance in updating of training aggrgates for Sarvatra bridging system. Assistance in incorporating codified nomednclature for modified items in Sarvatra bridging System
R&DE (Engrs) Jun-15 12 months 9.84
136 Mohinder Singh Sc. 'D' (Retd) Professional Services for implementing setup of test beds for testing of engines and motors with latest computerised testing & monitoring system and conduct of tests for Engines & motors. ( Contract RDE-30 )
Remarks:
Consultancy services for installation and commissiong of Regenerative type 50KVA dynamometer, PC base Edngins , Fuel Consumption meter , calculation of load Engine & moptors, connecting temperature probes, conduct of various test on engine, preparing exhaustive test reports.
R&DE (Engrs) Jun-15 6 months 5.80
137 A Basu Sc. E(Retd) N21553 dated 21/7/2015- Professional Service Qualitative Requirement for expert in design of test fixtures for qualifiaction to new project components for Agni Variants under simulated dynamic loads made of high strength materials involving Welding/Forging/Forming& heat treatment. (RDE-29)
Remarks:
Carry out study on research papers and literatures to evolve suitable design of test rigs and fixturesfor qualifaction of new design of components made of variety of high strength materials. Formulate procedure for evaluation testing and generate data for qualification of design. Incorporate relevant specification and codal provisions in quality assurance documents and engineering drawings after discussion with project officers. To guide and assist project offiocers in solving regular technical queries with respect opt design quality conformance manufacture and testing.
R&DE (Engrs) Jul-15 15 months 7.39
138 KC Jacob Sc. D(Retd) Professional Service for Fluid Power System Design, Manufacture, Installation, commissioning and Testing ( Contract RDE-31)
Remarks:
Universal hydraulic component test. Cylinder test bench. Pump Motor test bench. Assist preparation of the technical specifications for the test bench. Assist to interact with the likely vendors for proprosals.
R&DE (Engrs) Aug-15 18 months 8.67
139 Kishan Singh, Sc. D (Retd) Professional Service for Assistance in Manufacturing of Mechanical Systems for various Weapon Systems Programme ( Contract RDE-32 )
Remarks:
Exposure in Welding field particularly related to TIG/MIG welding applications to both ferrous and nonferrous metals.
R&DE (Engrs) Sep-15 12 months 9.21
140 HR Khadilkar, Sc. 'F' (Retd) Professional Service Qualitative Requirement for One expert in Technical Documentation, Project Procurement and Project management for Counter Mine Flail (CMF) Project (contract RDE-33)
Remarks:
Formulation, drafting and vettting of quality assurance documents like ATP,QAP for fieldable eqpt. Interaction with equipment vendors for techincal specifications/technical data to prepare technical documents. Preparing Forecast/Revised Budget for the project. Overall Interaction with MMG for all procurement related documents and actions.
R&DE (Engrs) Oct-15 4 months 2.68
141 AV Tuljapurkar Sc. 'D' (Retd) N21557 dated 11 Mar 2016- Professional Assistance in Revising & Updating of Technical Documents & Drawings of Shoirt Span Bridging System-5 m - RDE-34
Remarks:
Assitance in revising and updating of technical documentation including QAP and ATP for Short Span Bridging System-5 m. Assistane in revising and updating of drawings of components, sub-systems Bridge superstructure and launching Mechanism.
R&DE Mar-16 8 months 9.87
142 HR Khadilkar Sc. 'F' (Retd) N21651 dated 4/11/16-Professional Services Qualitative Requirement for Project Documentation-RDE-38
Remarks:
Concept building for the Nipun mine layer and Universal Mine Layer. Finalisation of integration drawings and formulation of intefrration sequence for overall BML PROTO II and Replenishment system integration.
R&DE Nov-16 12 months 9.16
143 VB Ware Sc. 'F' (Retd) Professional assistance in Development of Self Propelled Mine Burier and Mine Field Marking Equipment MK-II ( Contract -RDE-39 )
Remarks:
Vetting of engineering drawings for SDPMB and MFME MK-II. Changes in the documents UHB, Technical Manual, CES, MRLS, Layout of ISPL for the projectsSPMB, MFME MK-II SPMB & Drafting text portion of ISPL of the above projects
R&DE Nov 16 18 months 8.28
144 AV Tuljapurkar Sc. D(Retd) Professional Assistance in Revising & Updating of Technical Specification & Engineering Drawings of Short Span Bridging System-10 m- ( Contract RDE-37)
Remarks:
Assistance in revising and updating of technical documentation including ATP for Short Span Bridging System-10m. Assistance in revising and updating of Engineering drawings of components, sub-systems, Bridge superstructure, Launching Mechanism and Hydraulic System,.
R&DE Dec 16 8 Months 9.72
145 Kishan Singh, Sc D(Retd) Professional service for assists in manufacturing of Mechanical Systems for various Weapon Systems Programme ( Contract RDE-40 )
Remarks:
Assistance & guidance in manufcturing of various mechanism & mechanical systems, jigs & fixtures developent, inspection, testing of various mechanisms & mechanical systems, preparation of Technical documents and Reports.
R&DE Mar-17 12 months 8.79
146 GK Sarkar S. F (Retd) Professional Assistance in the Development of New /Existing projects: (Contarct R&DE-41)
Remarks:
To help in the development of concept for new/existing projects. To guide project team in the design calculations for the systems. Checking of Technical Specifications.
R&DE Sep-17 12 months 8.93
147 AV Tuljapurkar Sc. D (Retd) Professional Assistance in Revising and Updating of User documents of short span bridging system-10m ( Cotrat R&DE-42 )
Remarks:
Assistance in revising and updating of the User Hand Book, Mainenance Manual ,MRLS, Illustrated Spare parts list, complete equipments schedule (CES) Definition Dossier
R&DE Oct-17 8 months 9.76
148 SB Lokhande Sc. D(Retd) Professional Service Quality requirement for Projects Mine Field Marking Equipment MK-II(MFMEMK-II) & self propelled Mine Burier(SP MB) ( Contract R&DE-43)
Remarks:
Vetting of engineering drawings of MFME-II and SPMB. Preparation of the documents & incorporation of feed back received from user trials (i) User Hand Book (ii) Specification (iii) Techniucal cum maintenance manual (iv) complete equipment schedule (v) Layout of illustrateed Part List (ISPL) (vi) Technical support services in process of preparation of documents.
R&DE Mar-18 12 months 9.71
149 Shri R Vijayappan Sc. 'D' (Retd) "Preparation of Power Cartridge Compendium" (Contract RCMA- 1 )
Remarks:
Format for the compendium covering entire information regarding the catridge. This includes the general description, use/function, hardware design, explosive design, testing undergone, lifing trials, etc List prepared of all the catridges which have not been indigenised till date.
RCMA Jun-08 3 Months 1.01
150 Shri G C Popli Sc. 'F' (Retd) "Generation of Certification approach Documents “Astra & Brahmos Missile integration on Su-30 MKI Aircraft" (Contract RCMA - 2 )
Remarks:
• To study Su-30 MKI aircraft Mission Computer(MC), Display Processor(DP), Radar Computer(RC) & Weapon Control System(WCS) and generate certification approach document for avionics lCD of ASTRA Missile.. • To generate Certification Approach for aircraft data acquisition system during CFT-Ph-II, Ph-III and Launch phase. • To study Bus Load (MKIO-I and MKIO-ll) and generate certification approach for ASTRA Missile Integration on Su-30 MKIaircraft. • To generate Approach for ground integration methodology for CFT-Ph- II, Ph-III and Launch Phase • To study ASTRA guidance and Control Law and Generate Certification Approach Document for the same. • To generate EMI/EMC Test Document for ASTRA Integration on Su-30 MKI CFT-Ph-II, Ph-III and Launch/Release Phase • To study BrahMos Air Launched version and prepare appreciation document for Su-30 MKI modifications for BrahMos integration. • To study BrahMos launcher (adapter) developed by DRDL and prepare certification approach document for the same. It is also required to carry out reliability study of the launcher. • To study the ‘Signal Limiting System’ of Su-30 MKI aircraft and prepare approach document for BrahMos Integration with on su-30 MKI aircraft. • To study the aerodynamics instability and power plant compatibility issues of BrahMos integration on su-30 MKI aircraft. • To prepare an approach documents towards Airworthiness certification, analysis and test requirements for ensuring safe carriage and release from Su-30 MKI aircraft.
RCMA Jun-10 12 Months 5.51
151 Shri M R Joshi Sc. 'G' (Retd) "Development of Software tools for Avalanche Data Cards" (Contract SASE- 1 )
Remarks:
• using analysed test inputs • Graphs/charts with suitable colour coding utility • Digital terrain model from the SOI map and satellite images • Meteorological and geomorphological inputs
SASE Jul-03 8 Months 2.07
152 Shri M R Joshi Sc. 'G' (Retd) "Development of Avalanche Cards using Integrated Remote Sensing and GIS Technology for North- West Himalayas-20 Nos." (Contract SASE- 2 )
Remarks:
The Avalanche data cards have been prepared with Synoptic view, Identification of avlanche sites along the track, General description about the track covering, information about avalanche sites, information about the sectors highlighting, surface p;rofile along the track giving.
SASE Nov-03 9 Months 10.87
153 Shri M R Joshi Sc. 'G' (Retd) "Creation of Database as per users requirements for identification of Avalanche Prone areas and proper compilation of various kinds of information about the area of interest in GIS environment." (Contract SASE- 3 )
Remarks:
• Slope, aspect and elevation analysis on the DEM of a study area. • Slope profiles • Semi automatic markings of avalanche sites using satellite imageries and ground based information • Data of Terrain conditions, climatic conditions, Geomorphology, nature of snow fall etc • Met Data, snowfall, temp and wind speed etc • Casualty information along the track at different avalanche sites; vegetation cover (Forested/Nonforested) along track • Development of Avalanche data cards consisting of general diescription about the sectors/zones, track and avalanche sites.
SASE Dec-04 9.5 Months 9.10
154 Shri P C George Sc. 'E' (Retd) "Preparation of GIS based Digital Avalanche Atlas." (Contract SASE- 4 )
Remarks:
• Development of Avalanche Atlas which contains all the information about the area for which inputs are readily available • Software for Compilation of information using Visual Basic to access the digital avalanche atlas. The software is on menu driven format and contain back end data base using Arc GIS • The Axis information like area name, map sheet no, slope image, aspect image etc
SASE May-06 6 Months 9.90
155 Shri P C George Sc. 'E' (Retd) "(Contra Preparation of GIS based Digital Avalanche Atlas using advanced Geomatics techniques ct SASE- 5, Geomatics)" (Contract SASE- 5 )
Remarks:
The Digital Avalance Atlas of Chokibai :- 1. (a) Climatology and Geomorphology of the area (b) Avalanche formation and contributory factors © Avalanche classification and Methods of control (d) Avalanche safety and rescue (e) Glossary 2. Digital data - base generation using GIS and remote sensing tools 3. Compilation of information 4. Guidelines for preparation of Digital Avalanche Atlas for Darcha-Shinkula -Padam-Nimu Axis
SASE Mar-07 10 Months 9.91
156 Shri R Vijayappan Sc. 'D' (Retd) "Project on "Updating (up to year 2000) surface climatology of Western Himalaya" (Contract SASE- 6 )
Remarks:
• Collection, quality control and validation of the data by applying various checks as per norms in practice • Validation of additional checks to be applied • Preparation of climate tables and climatographs for individual stations and climatology in respect of maximum and minimum temperatures and precipitations for all stations • Application of regression analysis and covariance matrix for missing data
SASE Apr-07 15 Months 7.39
157 Shri D K Prashar Sc. 'F' (Retd) "Preparation of SASE database & Technical documents on the evaluation of Snow & Avalanche Studies in SASE for the period 1969-1979" (Contract SASE - 7 )
Remarks:
All information pertaining to the major activities of the Lab were included for each year. The search operation of any particular field could be carried out through a prime key viz year. The data base thus generated on oracle platform could be used for future analysis and reference. The data base thus generated should have a scope for improvement and updation of information
SASE Feb-08 18 Months 7.75
158 Shri R Vijayappan Sc. 'D' (Retd) "Preparation of GIS based Digital Avalanche Atlases for a part of J&K Himalaya" (Contract SASE – 8 )
Remarks:
• Finalisation of technical specifications consisting of climatology, geomorphology, avalanche contributing factors, classification, control, safety and rescue issues etc • Generation of digital data base using GIS, remote sensing and collateral data • Development/customization of software to access the digital avalanche atlases • Application of GIS bases weightage/index analysis for identification of avalanche sites
SASE Apr-08 8 Months 9.85
159 Maj Gen (Retd) S S Sharma, KC VSM Maj Gen "Geomorphological investigation of A F G" (Contract SASE - 9 )
Remarks:
• Generation of geo-morphological data base using GIS and remote sensing techniques • Collection of geo-morphological data and ground truths through field survey • Collection of information at Indian station at Atarctica during summer expedition • Integration of collected geo-morphological data and avalanche information in a GIS based system. • Developing 3 D fly through models of the glacier area along with draped avalanche sites as well as geo-morphologic details.
SASE May-08 12 Months 9.27
160 Shri D N Sethi Sc. 'F' (Retd) "Engineering Audit of Avalanche control structure at MSP-10 & MSP-7 Avalanche site (HP)" (Contract SASE - 10 )
Remarks:
• Study of basic structural design and methodology of erection of civil engineering structures like pylons, box girders, deflectors, piers, raft, main gallery, extended gallery, zigzag wall etc • Structural analysis of components and assembly • Conducting sample tests at site lab • Interpretation of results and comparison with theoretical outputs • Finalisation of the design
SASE Jul-08 16 Months 8.90
161 Shri D N Sethi Sc. 'F' (Retd) "Training in avalanche safety and rescue methods for the troops deployed in snow bound region in North – East" (Contract SASE- 11)
Remarks:
• Training in various aspects of Snow and Avalanche and Meteorological aspects related to avalanche hazard to Army users in J&K at Srinagar and in Nort est at Siliguri/Tezpur.
SASE Oct-08 4 Months 3.29
162 Maj Gen (Retd) S S Sharma, KC VSM Maj Gen "Statistical downscaling & post processing of weather forecasting model outputs." (Contract SASE - 12 )
Remarks:
• Downscaling of data by dynamical, synoptic weather typing, stochastic weather generator and trans-function approaches scheme. • Application of the model for forecasting dry bulb temperature, max and min temperature and using various forecast parameters for all the grids • Selection of predictors which have significant correlation among themselves and reduce it to minimum number • Development of regression equations for each parameter for 24 hor and 48 hour forecast. • Subjecting the data to Statistical post processing • Development of multivariate linear regression and removal bias in the model unit, if any. • Study of model improvement by calculating RMSE and other skill scores
SASE Mar-09 12 Months 8.75
163 Shri R Vijayappan Sc. 'D' (Retd) "Preparation of GIS based Digital Avalanche Atlases for a part of J & K Himalaya - Drass - Bimbat, Drass – Firmbase" (Contract SASE - 13 )
Remarks:
• General information like Climatology and Geomorphology of the area, Avalanche formation and contributory factors, Avalanche classification, Methods of control, Avalanche safety and rescue, and Glossary, Graphic representation of climatology and geomorphology of the area under study • Generation of digital data base using GIS, Remote Sensing & collateral data • Mapping of the registered/reported avalanche sites on SASE maps and satellite imagery • Marking of distance/location, Map ref and GR of each avalanche site • Classification of individual avalanche sites: Formation, Middle and Run-out zone. • Avalanche path length and its probable effect on road/track • Incorporation of reported behavior pattern and control measures by evolving criterion to decide the behavior pattern of avalanche including return period • Past history of avalanche occurrences and accidents (if any) • L—section profile of individual site • Road / Track profile duly marked with avalanche sites and affected length • Individual avalanche site marked on photographs, summer/winter Satellite (Merged product-LISS & PAN) imagery. • Digital terrain model draped with all vector layers, such as avalanche sites, road network, settlements, forest cover. • Development of 3D terrain fly-through with options of variable speeds • Implementation of security features in the • Application of GIS based weightages /index analysis for identification of avalanche sites, based on the knowledge/information of avalanche sites in a climatic zone. On the basis of the criterion evolved, attempt shall be made to identify unknown avalanche sites with return period (frequency) of a particular climatic zone. • Conversion of existing Digital Avalanche information system from static to dynamic mode for easy visualization, study, update and decision making. Accessing to the area should be through GR, Name, Lat / Long, search model. • Documentation
SASE Jun-09 8 Months 9.80
164 Shri D N Sethi Sc. 'F' (Retd) "Zone planning and preliminary layout of Avalanche Control Structure from MNP-2 to MNP-5 on approach road to north portal of Rohtang tunnel." (Contract SASE - 14 )
Remarks:
• Zone planning of avalanche path affecting approach road to north portal of Rohtang tunnel • Identification of possible flow parameters of avalanche and estimation of avalanche affected width • Determination of avalanche flow parameters at different sites at highway levels and near avalanche control structures • Preliminary layout of avalanche control structures and determination of snow and avalanche forces for design of structures • zone planning, avalanche hazard mapping, flow parameters, calculation of design forces and layout of formation and middle zone control structures for each site on maps/drawings. • Documentation
SASE Jul-09 12 Months 8.70
165 Mrs Vasatha Ramaswamy Sc. 'F' (Retd) "CFD Analysis & simulation of Snow Drift using software fluent /EDEM." (Contract SASE - 15 )
Remarks:
• Study of snow mass flux during different modes of transportation • CFD Analysis of snow drift using software for various conditions like terrain, obstruction, viscosity, velocity etc • Simulation model of snow drift • Validation of the model with field data and wind tunnel experimental data
SASE Aug-09 06 Months 9.88
166 Dr K C Sharma Sc. 'F' (Retd) "Hollow Catch Dams Made of Steel Poles For Avalanche Retardation and Snow Harvesting" ( Contract SASE - 16 )
Remarks:
• Mathematical model for the interaction of Snow Chute flow with the Hollow Catch Dam Structures • Velocity profile with respect to time of flow of the Hollow catch dam area • Number of rows required for complete energy dissipation of an avalanche (snow chute flow) of given velocity, density, volume of flow and discharge. • Fabrication drawings for the proposed hollow catch dams and space frame structures • The layout arrangement of structures used in the study • Plan of experiments to be conducted for the verification of the model results
SASE Jun-10 15 Months 8.83
167 Maj Gen (Retd) S S Sharma, KC VSM Maj Gen "Downscaling of weather pattern to precipitation amount during winter (November-April) using Non-Homogeneous Hidden Markov Model (NHMM)" ( Contract SASE - 17 )
Remarks:
• Modeling of weather forecasts on 24 and 48 hour basis specific to local stations using the data • Applying general circulation model to the above data and analyse the pattern for hidden/ non available parameters • Statistical post processing to remove bias, if any • Selection of hidden states • Finalisation of precipitation forecast model
SASE Oct-10 8 Months 5.33
168 Maj. Gen. S S Sharma, KC VSM, Sc. 'G' (Retd) “Developing regression model for extended range precipitation forecast for winter season(Dec-April) over Northwest and Central Himalaya using North Atlantic Oscillation (NAO) as a Precursor” (Contract SASE - 18 )
Remarks:
Regression model for extended range precipitation forecast for winter season (Dec-Apr) over North west and Central Himalaya using NAO (North Atlantic Oscillation as a precursor using voluminous station based monthly NAO data over different grids and OLR,, SST data down loaded fom various sources. A Regression equation developed based on above data and comprehensive report giving all asopects of the model, and future course of action submitted SASE, Chandigarh
SASE Jul-12 6 months 9.93
169 i) Maj Gen (Retd) S S Sharma, KC VSM Maj Gen “Developing Principal Component regression model for extended range precipitation forecast for winter season(Dec-April) overtwo separate regions of Northwest and Central Himalay using North Atlantic Oscillation (NAO) EI Nino/Enso ." (Contract SASE - 19
Remarks:
Finding relation between North Atlantic Oscillation(NAO) and winter preciptation over Jammu and Kashmir situtated over Pir Panjal and Great Hiumalaya Range. Finding relation between EI Ninio/Enso and Winter precipitation over Jammu and Kashmir situated over Pir Panjal and Great Himalaya range. Finding relation between North Atlantic Oscillation and Winter Precipitation over Himachal Pradesh situated over Pir Panjal. Finding relation betwen EI Nino/Enso and Winter Precipitation over HNimachal Pradesh situated over Pir Panjal. Using EOF Analysis and developing PCR for both the regions.
SASE Mar-13 6 months 9.52
170 Maj. Gen. S S Sharma, KC VSM, Maj.Gen “Developing Statistical model for monthly Precipitation forecast for winter season (Dec-April) over Three separate regions of North-west and Central Himalaya using NAO, EI Nino and IOD as predictors ( Contract SASE-20 )
Remarks:
Finding relation between North Atlantic Oscillation(NAO) and winter preciptation over Jammu and Kashmir situtated over Pir Panjal and Great Hiumalaya Range. Finding relation between EI Ninio/Enso and Winter precipitation over Jammu and Kashmir situated over Pir Panjal and Great Himalaya range. Finding relation between North Atlantic Oscillation and Winter Precipitation over Himachal Pradesh situated over Pir Panjal. Finding relation betwen EI Nino/Enso and Winter Precipitation over HNimachal Pradesh situated over Pir Panjal. Using EOF Analysis and developing PCR for both the regions.
SASE Jan-14 3 months 5.42
171 Shri R R Gosavi Sc. 'D' (Retd) " Consultancy regarding Transfer of Technology Documentation in respect of multi-mode hand Grenade." (Contract TBRL- 1 )
Remarks:
• Study of functional requirements, design constraints, choice of material and manufacturing process • Design of packaging for easy transportation, safe/robust handling • Batch production, assembly and static tests/trials • Firing trials to assess their efficacy and robustness • Design of packaging for easy transportation, safe/robust handling
TBRL Nov-03 9 Months 3.00
172 Shri R R Gosavi Sc. 'D' (Retd) "Consultancy regarding monitoring of pre-production phase of multimode hand grenade " ( Contract TBRL-2 )
Remarks:
IDST provided necessary assistance in this task in following manner: • To visit production site of filled as well as hardware components including vendors sites • to visit the production site during or after manufacturing of important hardware components. • to monitor the process during filling of explosive components at the production agency. • Attending static/dynamic trials during production phase. Attending final proof trials after the assembly of each lot at production agency • Analysis/scrutiny of various documents/reports/tests/proofs etc such as ? Lab tests of raw materials, components and explosive items ? Shop tests during production phase ? The test results submitted by production factories/suppliers ? Dynamic tests for proof purposes
TBRL Dec-06 18 Months 9.82
173 Shri R K Syal Sc. 'G' (Retd) "Evaluation of proposal from PSU/PVT. Firm for HMX production Plant" Contract TBRL – 3 )
Remarks:
• Evaluation of existing process for HMX production and to suggest improvements and advanced control/safety features. • Evaluation of proposals form vendors for the HMX production plant • Technical and financial aspects of proposal, including design drawings, PID etc. • Incorporation of advanced control and safety features for ex-production plants. • Technical discussion with firm for making Tender Document ensuring turn-key contract
TBRL Jan-09 12 Months 7.43
174 Dr H S Yadav Sc. 'G' (Retd) For "Theoretical Study to Predict Shock and Impact Sensitivity of Solid Explosives" Contract TBRL - 5, Solid Explosives
Remarks:
• Estimation of theoretical maximum density and velocity of detonation of explosives like TNT, RDX, HMX, and RDX/TNT • Determination of velocity of detonation at intial density of the explosive, • Computation of critical shock energy of the of known Hugoniot and known width of reaction zone • Analysis of impact-generated shock parameters in the explosive and the projectile • Development of impact initiation criterion • Determination of critical impact velocity of kinetic energy projectiles for initiation of detonation in explosives • Validation of the theoretical study by comparing with critical shock energy of various known explosives
TBRL Sep-10 12 Months 7.35
175 Air CMDE Raghubir Singh “Design Studies for Modular Rocket Motor(MRM) for RTRS Facility” (Contract TBRL-6 )
Remarks:
a) To extend the length of Track from 2.0 Km (existing) to 4.0 km (b)Install another 4.0 Km parallel tracks with ti-rails & wider gauges. © Additional civil works for technical buildings closer to the new zero point (d) Development of new Rocket Motors for RTRS so as to achieve higher velolcity. (e) Design and fabrication of Aerodynamic Sleds (f) Development of advance Instrumentation for the facility
TBRL Oct-12 12 months 9.94
176 Air CMDE Raghubir Singh Air Cmde(Retd) Consultancy for Development of RRM2 for RTRS Facility ( Contract TBRL-7)
Remarks:
Quality control during development & fabrication/reliazation of Hardware & Liners. Assistance during the qualification tests of Rocket Components. Design Modification and preparation of reports . Coordination with Ordnance Factories for propellant related activities . Participation in Design reviews and finalisation of design of rocket motor components. Training for designing of Rocket Motors & fabrication processes to three RTRS personnel. Preparation of documents for the Static Bed Test Design. Participated in design reviews and finalisation of design of static test bed.
TBRL Jan-04 12 months 9.64
177 Shri P M Bhat Sc. 'F' (Retd) "Consultancy, Development of Altitude Test Frame for a two – stroke, Single Cylinder Engine and Altitude trials". (Contract VRDE- 1 )
Remarks:
• Design and development of Altitude Test Frame of cantilever with pusher type monoplane and finalization of its shape and size integrating appropriate test fixtures and data loggers • Integration of the frame with engine and UAV • Flight testing by remote controlled, tele command from ground station by radio control in visible range of upto 700 m height.
VRDE Sep-05 12 Months 9.91
178 Shri J L Raj Sc. 'D' (Retd) " Consultancy for Design Integration Testing & Technical Documentation of Electric System & HVAC system for UGV project ." (Contract VRDE - 2 )
Remarks:
• Preparation of master wiring diagram • Design of electrical harnesses for subsystems • Development of battery banks, battery charging, power distribution arrangement and battery control panels • Electrical wiring diagrams for internal and external lighting of shelters of UGV • Integration and testing of power management system and HVAC system
VRDE Nov-07 18 Months 5.25
179 Shri J L Raj Sc. 'D' (Retd) "Consultancy for design and development of hydraulic system and electrical circuit diagram of Transporter-Cum-Tilting (TCT) vehicle and Self propelled transporter as per PSQR " (Contract VRDE- 3 )
Remarks:
(a) Technical clarifications for queries of hydrauic system both of the basic trailer and articulation of the article. (b) Monitoring the prograss being made by con tractor and providing clarifications which are likely to arise during development of hydraulic system. (c) Preparatikon of Electrical circuit dikagram for giving DC power supply from 2X20KVA Gen sets for operation of Vehicle mounted article
VRDE Aug-07 12 Months 3.21
180 Prof (Dr) S Y Bhave Sc. 'G' (Retd) "Providing Technical Services for Dev of Vibration Isolation System." (Contract VRDE- 4 )
Remarks:
• Design/selection of vibration isolators for beam pointing optical system to limit vibration to acceptable level • Analysis of natural frequencies, mode shaped trailer, displacement at optical system, for inputs like sinusoidal, random and transient to four outriggers in operation mode and to air bags in transportation mode • Design of air bag suspension system • Vibration analysis of trailer structure with and without vibration isolators • Tests and evaluation trials of vibration isolators and air bag suspension
VRDE Jun-08 4 Months 4.17
181 Shri S P Shaha Sc. 'E' (Retd) r "Estimation of Ground Sinking Due to 400 t Dynamic Load Transfer Through Canister for A5 TCT Vehicle" (Contract VRDE- 5, Metallic Canister)
Remarks:
• Estimation of the sinking of ground through canister due to dynamic loading at various soil conditions • Estimation of sinking of ground below outriggers due to static load transfer at various soil conditions • Analysis using FEM techniques • Identification of fastest means for making ground harder for transferring the dynamic load without sinking • Selection of suitable anchoring device at the site during operation • Finalisation of test equipments, rigs, instruments for operation
VRDE Jun-08 5 Months 9.92
182 Shri J L Raj Sc. 'D' (Retd) "Technical Services for : i) Dev. of special purpose 16 x 16 vehicle. ii) Dev. of Integrated Mobile Shelter (IMS) vehicle." (Contract VRDE - 6 )
Remarks:
• Preparation of conceptual layouts • Study of specifications of similar vehicles • Preparation of technical specifications • Ascertaining suitability of various matching assemblies like engine, transmission etc • Performance prediction of the vehicle • Updating of design and technical specifications
VRDE Oct-08 14 Months 4.25
183 Shri S K Mishra Sc. 'D' (Retd) "Contract for Providing Technical Services for Study, Analysis, Design and Dev. Of Software" (Contract VRDE – 7, Dev of software)
Remarks:
• Study and analysis from documents, process, rules and interviews • Identification of system parameters and expert recommendations • Drawing system requirement specifications • Data analysis for efficiency, consistency and integrity • Specification of constraints • Design of relational tables • Development, testing and implementation of software
VRDE Jan-09 18 Months 7.82
184 Shri S M Wele Sc. 'G' (Retd) "Consultancy for generation of technical documentation for integrated mobile service vehicle" (Contract VRDE - 8 )
Remarks:
Technical details from various agencies were copiled and draft copies and Auto CAD drawing were prepared for the documents pertain to User Hand Book Vol. 1 & II , Technical Manual Vol.1 & II , Part Idedntification list, Illustrated part list , List of Spares, Design Specification
VRDE Aug-09 08 Months 9.92
185 Shri V B Ware Sc. 'F' (Retd) i)Dev. Of Multi Axle Heavy recovery vehicle ii) Dev. Of A2P TCT Vehicle" (Contract VRDE-10 )
Remarks:
• Study of specifications of recovery vehicles available within the country & abroad. • Preparation of conceptual layout. • Feasibility study. • Preparation of technical specification. • Performance prediction of the recovery vehicle viz. max speed & gradeability. • Updating of technical specification.
VRDE Jan-10 06 Months 2.28
186 i)Shri S M Wele, ) ii) Shri V B Ware, Sc. 'G' (Retd)Sc 'F' (Retd) "Documentation of IMS Vehicle Mk II". (Contract VRDE – 11 )
Remarks:
Study and sorting out data for various documents. Visits to various firms. Creation of 2D models for various systems using Auto Card. Creation of 3D models of various components & assemblies. Preperation User hand book , Technical Manual & Specifications.
VRDE Dec-11 10 months 9.95
187 Shri S K Misra, Sc. 'D' (Retd) To provide consultancy services for study, analysis, design & development of Troops Compartment for WHAP (Contract VRDE - 12 )
Remarks:
a)Assisted for collection of worldwide APC vehicles data, study and compilation. (b) Study of requirements, developments, elaborate discusison in projet team, estimation of space requirement, troops comfort, ergonomic study of seating arrangements etc. (c) Study and analyhsis of crew comfort. (d) Assisted in study of crew siurviability aspects (e) study of firepower requirements from troops compartment (f) Assisted in study of troops battle load (g) Assisted in preparation of feasibility study by above studies, by p;reparing study layouts , preparation of assy and detail drawings using solid modeling.
VRDE ug -12 18 months 7.98
188 Shri S M Wele, Sc. 'G' (Retd) Professional Services Qualitative Requirement for Techincal Documentation for Tractor Cum Tilter Vehnicle for A4 (Contract VRDE - 13)
Remarks:
a) User Hand Book - Function of each and every component of the system with full operating procedure, limited maintenance and repair schedule etc to be covered (b) Technical Manual- It will contain all necessary information required by the technicians in the organisation to serviice, repair and overhaul of the equipmednt. (c) Illustrated Part List - This list contain all seperately demandable components with adequate data for purpose of identification. (d) List of Spares- This contain list of essential spares, which are required to be issued along with each equipment to user.(e) Prepared for the purpose of identifying any componen t part or assembly of parts likely to be required as replicates.
VRDE Sep-13 12 months 9.13

 


Contact Us

registered office

Institute of Defence Scientists and Technologists
c/o Solid State Physics Laboratory,
Lucknow Road, Timarpur
Delhi - 110 054
Website: https://www.idst.co
bangalore Branch

AVIONIC BUILDING,
ADE CAMPUS,
NEW THIPPASANDRA POST
BENGALURU 560075

Phone: (080) 2528 3668 , 2505 8192, 2505 8193
Email: bengaluruidst@gmail.com
Website: https://bit.ly/3guLcEL
delhi Branch

CFEES Campus
Brig. S K Majumdar Road,
Timarpur
Delhi - 110 054


Phone: (011) 2381 0152, 2390 7263
Fax: (011) 2381 0152, 2381 9547
Email: idstdelhibranch@gmail.com
Website: https://bit.ly/2D4tpa0
headquarters

IDST HQ,
CFEES Campus,
Brig SK Mazumdar Road,
Timarpur, Delhi- 110054


Phone: (011) 23810152 , 9822019102 (SecGen)
Fax: (011) 23810152
Email: institute@idst.co
Website: https://bit.ly/34xG3ti
hyderabad Branch

DLRL Campus,
Chandrayanagutta,
Hyderabad - 500 005


Phone: (040) 2444 1310, 6281208477
Fax: (040) 2444 0375
Email: idst.hyd@gmail.com
Website: https://bit.ly/31vGLpb
pune Branch

Institute of Defence Scientists & Technologists
Pune Branch
ARDE Campus
35, DSC Line, Pashan
Pune - 411 021


Phone: (020) 2586 5428; 2586 5541
Fax: (020) 2586 5308
Email: idstpune@yahoo.com
Website: https://bit.ly/3hvmHsn
Related Links

http://www.aeroindia.in http://www.dsir.gov.in http://www.dst.gov.in/

© 2024 IDST. All Rights Reserved.
Powered by aplap software